Battery, solar and wind sites in Strathclyde
379 sites in Strathclyde, United Kingdom: 64 battery storage sites, 68 solar farms, 247 onshore wind farms. 87 operating, 105 being built, 68 in planning, 119 refused, withdrawn or closed. Each page shows the site's status and dates, any incident on the register that names it, and the incidents at sites like it.
64battery storage sites
68solar farms
247onshore wind farms
105being built
68in planning
Battery storageSolarOnshore windOffshore windFaded: refused, withdrawn or closed
- WhiteleeOnshore wind · 322 MW · Operational · 2 incidents
- ArdrossanOnshore wind · 24 MW · Operational · 2 incidents
- Afton Wind FarmOnshore wind · 50 MW · Operational · 1 incident
- Auchentiber Road - Battery Energy Storage SystemBattery storage · 700 MW · Awaiting Construction
- Coalburn Energy - Battery StorageBattery storage · 500 MW · Under Construction
- East Fulwood Energy StorageBattery storage · 400 MW · Application Submitted
- Clyde Wind FarmOnshore wind · 350 MW · Operational
- Red Moss - Battery StorageBattery storage · 342 MW · Awaiting Construction
- Kilmarnock South Substation - Battery storageBattery storage · 300 MW · Operational
- Bodinglee Wind FarmOnshore wind · 266 MW · Application Submitted
- Kyle WindfarmOnshore wind · 255 MW · Application Refused
- South Kyle Wind FarmOnshore wind · 240 MW · Operational
- North Kyle Energy ProjectOnshore wind · 206 MW · Under Construction
- Whitehill Energy StorageBattery storage · 200 MW · Awaiting Construction
- Windyhill Battery Storage FacilityBattery storage · 200 MW · Under Construction
- North Lanrigg Energy StorageBattery storage · 200 MW · Awaiting Construction
- Carlisle Road - Battery Energy Storage SystemBattery storage · 200 MW · Awaiting Construction
- Tullich Wind FarmOnshore wind · 180 MW · Application Withdrawn
- Clyde Wind Farm Extension (Clyde 2)Onshore wind · 173 MW · Operational
- Downiebrae Road, Rutherglen - Battery Energy Storage SystemBattery storage · 150 MW · Awaiting Construction
- Hare Hill Wind Farm RepoweringOnshore wind · 130 MW · Application Submitted
- Cumberhead West Wind FarmOnshore wind · 126 MW · Under Construction
- Black LawOnshore wind · 124 MW · Operational
- Hadyard HillOnshore wind · 120 MW · Operational
- Harelaw Renewable Energy ParkOnshore wind · 117 MW · Application Refused
- Sheirdrim Renewable Energy Development - WindOnshore wind · 114 MW · Appeal Refused
- Harrow's LawOnshore wind · 111 MW · Revised
- Whitelee Windfarm Extension phase 2Onshore wind · 109 MW · Operational
- Whitelee Windfarm Extension Phase 1Onshore wind · 108 MW · Operational
- Bodinglee Wind FarmBattery storage · 106 MW · Application Submitted
- Loch Awe - Eredine Wind FarmOnshore wind · 100 MW · Application Submitted
- Braidfield Road, Hardgate - Battery Storage FacilityBattery storage · 100 MW · Application Submitted
- Rogerhill Solar and Battery Energy Storage SystemSolar · 100 MW · Application Submitted
- Rogerhill Solar and Battery Energy Storage SystemBattery storage · 100 MW · Application Submitted
- Breezy Hill, North Kyle Forest Estate - Wind TurbinesOnshore wind · 100 MW · Application Submitted
- Limmer HillOnshore wind · 99 MW · Application Withdrawn
- South Kyle Wind Farm 2Onshore wind · 92.4 MW · Application Submitted
- Watchman Energy ParkOnshore wind · 91 MW · Application Submitted
- Kype Muir Wind FarmOnshore wind · 88.4 MW · Operational
- Hadyard Hill extensionOnshore wind · 88 MW · Application Withdrawn
- An Carr Dubh Wind FarmOnshore wind · 85.8 MW · Application Submitted
- Rowan Wind FarmOnshore wind · 85.8 MW · Awaiting Construction
- Chirmorie Wind FarmOnshore wind · 80 MW · Awaiting Construction
- Harelaw Renewable Energy Park Wind TurbinesOnshore wind · 80 MW · Revised
- Shira Wind FarmOnshore wind · 79 MW · Application Withdrawn
- Douglas West Wind Farm (extension)Onshore wind · 78 MW · Under Construction
- Bracco / Black HillOnshore wind · 72.5 MW · Application Withdrawn
- Waterhead MoorOnshore wind · 72.5 MW · Application Withdrawn
- Vale of Leven Wind FarmOnshore wind · 70 MW · Application Submitted
- Enoch HillOnshore wind · 70 MW · Operational
- Middleton Road - Linwood Battery Energy Storage SystemBattery storage · 69 MW · Abandoned
- DersallochOnshore wind · 69 MW · Operational
- Kype Muir Wind Farm ExtensionOnshore wind · 67.2 MW · Operational
- Bankend Rig III Wind FarmOnshore wind · 66 MW · Awaiting Construction
- High Brenfield Wind FarmOnshore wind · 66 MW · Application Submitted
- GalawhistleOnshore wind · 66 MW · Operational
- Allt Domhain Wind Farm, Glenbarr - Wind TurbinesOnshore wind · 64.8 MW · Application Submitted
- Lorg WindfarmOnshore wind · 64 MW · Awaiting Construction
- Musdale Wind FarmOnshore wind · 64 MW · Application Withdrawn
- Kennoxhead Wind FarmOnshore wind · 62 MW · Under Construction
- Saturland Farm, Salterland Road - Battery Energy Storage SystemBattery storage · 60.8 MW · Awaiting Construction
- Holmquarry Road - Battery StorageBattery storage · 60.4 MW · Awaiting Construction
- Inchbean Farm, Treeswoodhead Road - Battery Energy Storage SystemBattery storage · 60 MW · Awaiting Construction
- Kilpatrick HillsOnshore wind · 60 MW · Application Withdrawn
- NutberryOnshore wind · 60 MW · Application Withdrawn
- Spireslack WindfarmOnshore wind · 59.6 MW · Application Withdrawn
- Killean Wind FarmOnshore wind · 59.4 MW · Application Submitted
- Cruach Brenfield Wind FarmOnshore wind · 59.4 MW · Application Withdrawn
- Ladyfield Renewable Energy ParkOnshore wind · 58.5 MW · Awaiting Construction
- Heathland Wind FarmOnshore wind · 57.8 MW · Revised
- Keirs Hill (Sclenteuch) Wind FarmOnshore wind · 57.8 MW · Revised
- Whitelaw Brae Wind FarmOnshore wind · 57 MW · Under Construction
- Mark HillOnshore wind · 56 MW · Operational
- East Rogerton Cottage, Markethill Road - Battery Storage FacilityBattery storage · 55 MW · Awaiting Construction
- Greenock Wind FarmOnshore wind · 55 MW · Appeal Refused
- Linfairn Wind FarmOnshore wind · 54.4 MW · Appeal Withdrawn
- Creggan Wind FarmOnshore wind · 54 MW · Appeal Refused
- Sclenteuch Wind Farm - Wind FarmOnshore wind · 54 MW · Awaiting Construction
- Middle Muir Wind FarmOnshore wind · 51 MW · Operational
- East Rogerton Cottage, Markethill Road - Battery Storage FacilityBattery storage · 50 MW · Revised
- Seath Road, Rutherglen - Battery StorageBattery storage · 50 MW · Application Refused
- Watchman Energy ParkBattery storage · 50 MW · Application Submitted
- South Kyle Wind Farm 2Battery storage · 50 MW · Application Submitted
- ChalmerstonOnshore wind · 50 MW · Application Withdrawn
- Whitelees Hydrogen Production Facility, Solar Farm & Battery StorageBattery storage · 50 MW · Awaiting Construction
- Ardencaple Farm - Battery StorageBattery storage · 50 MW · Application Refused
- Broomloan Road - Battery Energy StorageBattery storage · 49.9 MW · Revised
- Flatterton Farm, Flatterton Road - Battery StorageBattery storage · 49.9 MW · Awaiting Construction
- SSE Taynuilt Substation - Battery Energy StorageBattery storage · 49.9 MW · Awaiting Construction
- Barnwell, Wright Street - Battery Energy StorageBattery storage · 49.9 MW · Application Refused
- Broomloan Road - Battery Energy StorageBattery storage · 49.9 MW · Awaiting Construction
- Govan Battery Energy Storage SystemBattery storage · 49.9 MW · Application Submitted
- Leadhills Road, Elvanfoot Phase 2 - BESSBattery storage · 49.9 MW · Application Submitted
- Beinn an Tuirc Windfarm Phase 3Onshore wind · 49.9 MW · Under Construction
- Cowans LawOnshore wind · 49.9 MW · Revised
- Cowans LawOnshore wind · 49.9 MW · Application Refused
- Well Street - Battery StorageBattery storage · 49.5 MW · Awaiting Construction
- Laigh Park Water Treatment Works - Battery Energy Storage SystemBattery storage · 49.5 MW · Application Submitted
- Lorg WindfarmOnshore wind · 49.5 MW · Revised
- Leadhills Wind FarmOnshore wind · 49 MW · Application Refused
- Black Law Extension - 1aOnshore wind · 48.4 MW · Operational
- A'Chruach (Phase 1)Onshore wind · 48.3 MW · Operational
- Raera ForestOnshore wind · 48 MW · Application Refused
- StacainOnshore wind · 48 MW · Appeal Refused
- Wings LawOnshore wind · 48 MW · Appeal Withdrawn
- Burnhead Wind FarmOnshore wind · 47.5 MW · Revised
- Black CraigOnshore wind · 47.5 MW · Application Withdrawn
- InverlieverOnshore wind · 47.5 MW · Application Refused
- Moorhouse (Eaglesham)Onshore wind · 47.5 MW · Appeal Refused
- Carraig GhealOnshore wind · 46 MW · Operational
- Sclenteuch Wind FarmBattery storage · 45 MW · Awaiting Construction
- Sneddon Law Community Wind FarmOnshore wind · 45 MW · Under Construction
- Ardchonnel Wind FarmOnshore wind · 45 MW · Appeal Refused
- Beinn an Tuirc Phase 2Onshore wind · 43.7 MW · Operational
- Glentaggart - Battery Energy StorageBattery storage · 42 MW · Awaiting Construction
- Corlarach HillOnshore wind · 42 MW · Appeal Refused
- Alt DeargOnshore wind · 42 MW · Application Refused
- Dalquhandy WindfarmOnshore wind · 42 MW · Operational
- Ladyfield Renewable Energy ParkBattery storage · 41.4 MW · Awaiting Construction
- Newton Farm, Westburn Road - Battery Storage FacilityBattery storage · 40 MW · Revised
- Gilbertfield Farm, Gilbertfield Road - Battery Storage FacilityBattery storage · 40 MW · Application Refused
- Cumberhead West Wind FarmBattery storage · 40 MW · Under Construction
- Breezy Hill, North Kyle Forest Estate - BESSBattery storage · 40 MW · Application Submitted
- Newton Farm, Westburn Road - Battery Storage FacilityBattery storage · 40 MW · Application Refused
- Kennishead Road - Battery Energy StorageBattery storage · 40 MW · Application Withdrawn
- Whitelees Hydrogen Production Facility, Solar Farm & Battery StorageSolar · 40 MW · Awaiting Construction
- Dalmarnock Road - Battery StorageBattery storage · 40 MW · Awaiting Construction
- Harrow's LawOnshore wind · 39 MW · Appeal Refused
- Sheirdrim Renewable Energy Development - BatteryBattery storage · 38 MW · Appeal Refused
- Straid Farm Wind ParkOnshore wind · 36.8 MW · Appeal Refused
- Tangy Wind Farm - repowering/Tangy 3Onshore wind · 36.8 MW · Planning Permission Expired
- Mill Rig Wind FarmOnshore wind · 36 MW · Under Construction
- AndershawOnshore wind · 36 MW · Operational
- Auchrobert Wind FarmOnshore wind · 36 MW · Operational
- Blary Hill Wind FarmOnshore wind · 35 MW · Operational
- Beinn Ghlas Wind Farm - RepoweringOnshore wind · 33.6 MW · Application Submitted
- Cruach MhorOnshore wind · 33.3 MW · Operational
- Hawkwood Wind Farm, Kype Highway - Wind turbinesOnshore wind · 33 MW · Application Submitted
- Little Gala Wind FarmOnshore wind · 30 MW · Appeal Withdrawn
- Easter Cringate Cottage, Polmaise Road - Wind TurbinesOnshore wind · 30 MW · Application Submitted
- CorriechreiveOnshore wind · 30 MW · Application Refused
- HunterstoneOnshore wind · 30 MW · Application Refused
- Leapmoor ForestOnshore wind · 30 MW · Application Withdrawn
- HartwoodOnshore wind · 30 MW · Application Withdrawn
- West BrowncastleOnshore wind · 30 MW · Operational
- Dungavel HillOnshore wind · 29.9 MW · Operational
- Hare Hill ExtensionOnshore wind · 29.8 MW · Operational
- Beinn an TuircOnshore wind · 29.7 MW · Operational
- Kennoxhead Wind Farm (Phase 2)Onshore wind · 28 MW · Awaiting Construction
- Bonnyton, Kirkton Moor Road - Solar PV PanelsSolar · 28 MW · Awaiting Construction
- KelburnOnshore wind · 28 MW · Operational
- Calder Water Community Wind FarmOnshore wind · 28 MW · Operational
- Hill Rig Community WindfarmOnshore wind · 28 MW · Revised
- Altercannoch Wind FarmOnshore wind · 27.7 MW · Appeal Refused
- High Cumnock Wind FarmOnshore wind · 27.2 MW · Appeal Refused
- West Benhar wind farmOnshore wind · 27.2 MW · Operational
- Penbreck & Carmacoup ForestOnshore wind · 27 MW · Revised
- Penbreck & Carmacoup ForestOnshore wind · 27 MW · Revised
- Allt Rubha Wind FarmOnshore wind · 27 MW · Application Withdrawn
- East KingswellOnshore wind · 26 MW · Application Refused
- Hagshaw Hill Wind Farm ExtensionOnshore wind · 26 MW · Operational
- Swinlees Wind FarmOnshore wind · 25.6 MW · Awaiting Construction
- Elvanfoot, Leadhills Road - Phase 3 - BESSBattery storage · 25 MW · Application Submitted
- Knockair, Dougliehill Road - Solar FarmSolar · 25 MW · Application Submitted
- Merkins Wind FarmOnshore wind · 25 MW · Application Refused
- Assel Valley Wind FarmOnshore wind · 25 MW · Operational
- Knockair, Dougliehill Road - Battery Storage FacilityBattery storage · 24 MW · Application Submitted
- GartnagrenachOnshore wind · 24 MW · Application Withdrawn
- Goodbush HillOnshore wind · 24 MW · Application Withdrawn
- SalsburghOnshore wind · 24 MW · Application Withdrawn
- Inverclyde Wind Farm (Corlic Hill)Onshore wind · 24 MW · Operational
- Greengairs East Wind FarmOnshore wind · 24 MW · Operational
- Freasdail Wind FarmOnshore wind · 22.5 MW · Operational
- Polquhairn Wind FarmOnshore wind · 22.5 MW · Revised
- ArdeerOnshore wind · 22 MW · Application Withdrawn
- Glen AppOnshore wind · 22 MW · Operational
- Garleffan Wind FarmOnshore wind · 21.6 MW · Appeal Refused
- Nether braco FarmOnshore wind · 21 MW · Application Withdrawn
- Largie Windfarm IIOnshore wind · 21 MW · Application Refused
- Ashmark Hill Wind FarmOnshore wind · 21 MW · Appeal Refused
- Cour Wind FarmOnshore wind · 20.5 MW · Operational
- Low Drumclog Farm, Drumclog - 3 Wind TurbinesOnshore wind · 20 MW · Awaiting Construction
- Vale of Leven Wind FarmBattery storage · 20 MW · Application Submitted
- Damside Wind FarmOnshore wind · 20 MW · Application Refused
- Strone Saul HillOnshore wind · 20 MW · Application Refused
- Tralorg Wind FarmOnshore wind · 20 MW · Operational
- Douglas West Wind Farm (extension)Battery storage · 20 MW · Application Submitted
- Sheirdrim Renewable Energy Development - SolarSolar · 20 MW · Appeal Refused
- Douglas West Wind Farm (extension)Battery storage · 20 MW · Under Construction
- Wardlaw Wood Windfarm - Battery StorageBattery storage · 20 MW · Awaiting Construction
- Wardlaw Wood - Solar FarmSolar · 20 MW · Awaiting Construction
- Glasgow Airport Solar FarmSolar · 19.9 MW · Under Construction
- Tofts - Battery StorageBattery storage · 19.9 MW · Awaiting Construction
- Breaker HillOnshore wind · 19.5 MW · Revised
- Knoweside HillOnshore wind · 19.5 MW · Application Withdrawn
- An SuidheOnshore wind · 19.3 MW · Operational
- Burnhead Wind FarmOnshore wind · 18.4 MW · Appeal Refused
- Caledonian Solar ParkSolar · 18.4 MW · Awaiting Construction
- Millour Hill Community WindfarmOnshore wind · 18 MW · Revised
- Millour Hill Community WindfarmOnshore wind · 18 MW · Operational
- Calla Wind FarmOnshore wind · 18 MW · Application Refused
- Shotts wind farmOnshore wind · 18 MW · Appeal Refused
- Wardlaw WoodOnshore wind · 18 MW · Operational
- Greengairs Wind FarmOnshore wind · 17.5 MW · Planning Permission Expired
- Crofthill Wind FarmOnshore wind · 17 MW · Application Refused
- Glentaggart Wind FarmOnshore wind · 17 MW · Appeal Withdrawn
- Corwar Wind FarmOnshore wind · 16.4 MW · Appeal Refused
- Loganswell FarmOnshore wind · 16 MW · Application Withdrawn
- Deucheran HillOnshore wind · 15.8 MW · Operational
- Cnoc Donn ArnicleOnshore wind · 15 MW · Operational
- Clachan Flats Wind FarmOnshore wind · 15 MW · Operational
- Nutberry Wind FarmOnshore wind · 15 MW · Operational
- CRAIGANNET WIND FARMOnshore wind · 15 MW · Appeal Refused
- Millenderdale Wind FarmOnshore wind · 15 MW · Appeal Refused
- Benhar WindfarmOnshore wind · 15 MW · Appeal Refused
- Black Law Extension - 1bOnshore wind · 15 MW · Operational
- Largie Wind FarmOnshore wind · 14.9 MW · Application Refused
- Bankend RigOnshore wind · 14.3 MW · Operational
- KilchattanOnshore wind · 13.6 MW · Appeal Refused
- Hare Hill (East Ayrshire)Onshore wind · 13.2 MW · Operational
- Hunterston Test CentreOnshore wind · 13 MW · Decommissioned
- Tangy Wind Farm/Tangy 1Onshore wind · 12.8 MW · Operational
- MuirhallOnshore wind · 12.3 MW · Operational
- Central Eco Park - Solar FarmSolar · 12 MW · Awaiting Construction
- Middleton Wind FarmOnshore wind · 12 MW · Operational
- Whitelee Windfarm Extension Phase 3Onshore wind · 12 MW · Appeal Refused
- Starryshaw Wind FarmOnshore wind · 12 MW · Application Refused
- Cove Community Wind FarmOnshore wind · 11.5 MW · Application Withdrawn
- Dungavel House, IRC Muirkirk Road - Wind FarmOnshore wind · 11.4 MW · Awaiting Construction
- Crookedstane FarmOnshore wind · 11.4 MW · Planning Permission Expired
- Lion Hill Wind Farm (Crookedstane Farm 2)Onshore wind · 11.4 MW · Planning Permission Expired
- Allt Dearg Wind Farmers LLPOnshore wind · 10.8 MW · Operational
- Bankend Wind Farm (extension)Onshore wind · 10.2 MW · Revised
- Bankend Rig II Wind FarmOnshore wind · 10.2 MW · Revised
- Bankend Rig II Wind FarmOnshore wind · 10.2 MW · Awaiting Construction
- Greenburn Wind ParkBattery storage · 10 MW · Awaiting Construction
- Elvanfoot, Leadhills Road - Battery StorageBattery storage · 9.8 MW · Awaiting Construction
- Ardeer Peninsula, Ardeer - Wind TurbinesOnshore wind · 9.6 MW · Awaiting Construction
- NEILSTON WIND FARMOnshore wind · 9.2 MW · Operational
- Ballygroggan FarmOnshore wind · 9 MW · Application Refused
- Torrance FarmOnshore wind · 9 MW · Operational
- Blantyre Muir Wind FarmOnshore wind · 9 MW · Operational
- Poniel Wind TurbinesOnshore wind · 9 MW · Application Withdrawn
- Sorbie FarmOnshore wind · 9 MW · Under Construction
- Aggreko, Stirling Road - Solar PanelsSolar · 8.8 MW · Application Submitted
- Olympic Business Park, Dundonald - 2 Wind TurbinesOnshore wind · 8.5 MW · Application Refused
- Muirhall SouthOnshore wind · 8.3 MW · Operational
- CLACHAN SEIL WIND FARMOnshore wind · 8.1 MW · Application Refused
- Hunterston Test Centre (Phase 2)Onshore wind · 8 MW · Application Withdrawn
- Beinn Ghlas Wind FarmOnshore wind · 7.8 MW · Operational
- Hagshaw Hill Wind FarmOnshore wind · 7.8 MW · Operational
- Hagshaw Hill Wind FarmOnshore wind · 7.8 MW · Operational
- West Dykes Head - Wind turbinesOnshore wind · 7.6 MW · Application Refused
- Sorbie Farm wind clusterOnshore wind · 7.5 MW · Application Withdrawn
- GlaxoSmithKline Wind ProjectOnshore wind · 7.5 MW · Operational
- Blantyre Muir Wind Farm extensionOnshore wind · 7.5 MW · Operational
- Ardoch and Over Enoch Wind Farm (Ardoch)Onshore wind · 7.2 MW · Operational
- Breaker HillOnshore wind · 7.2 MW · Appeal Refused
- Auchadaduie Wind FarmOnshore wind · 6.9 MW · Operational
- Muirhall ExtensionOnshore wind · 6.8 MW · Operational
- Alton Muirhouse FarmOnshore wind · 6.8 MW · Appeal Refused
- Over Enoch FarmOnshore wind · 6.5 MW · Abandoned
- Millour Hill Community Windfarm (Extension)Onshore wind · 6.4 MW · Operational
- Lochhead FarmOnshore wind · 6 MW · Operational
- Millour Hill Community Windfarm (Extension)Onshore wind · 6 MW · Revised
- Tangy Wind Farm Extension/Tangy 2Onshore wind · 6 MW · Operational
- Srondoire Community Wind FarmOnshore wind · 6 MW · Operational
- Ardrossan ExtensionOnshore wind · 6 MW · Operational
- Torrance Farm Wind Park ExtensionOnshore wind · 5.7 MW · Operational
- Rowan Wind FarmBattery storage · 5 MW · Awaiting Construction
- Cartland Muir Wind FarmOnshore wind · 5 MW · Application Refused
- HunterstonBattery storage · 5 MW · Abandoned
- BallochmartinSolar · 5 MW · Revised
- National Wind Turbine Test SiteOnshore wind · 4.7 MW · Operational
- BirniehillOnshore wind · 4.5 MW · Application Refused
- Ardoch and Over Enoch Wind Farm (Over Enoch)Onshore wind · 4.3 MW · Operational
- Nether Carswell Cottage Wind TurbineOnshore wind · 4.2 MW · Abandoned
- Nether Carswell Cottage Wind TurbineOnshore wind · 4.2 MW · Awaiting Construction
- GreendykesideOnshore wind · 4 MW · Operational
- Skares WindfarmOnshore wind · 4 MW · Application Withdrawn
- Helensburgh Community Wind FarmOnshore wind · 4 MW · Application Withdrawn
- Knockshinnoch Wind FarmOnshore wind · 4 MW · Awaiting Construction
- Whitelaw Brae Wind farmBattery storage · 4 MW · Awaiting Construction
- Ardoch Farm (East Renfrewshire)Onshore wind · 3.9 MW · Abandoned
- Glenhove Pumping Station, Glenhove Road - BESSBattery storage · 3.1 MW · Application Submitted
- Laggan WindclusterOnshore wind · 3 MW · Application Refused
- Cathkin Braes Wind Farm (Castlemilk)Onshore wind · 3 MW · Operational
- West DykesOnshore wind · 3 MW · Revised
- Ascog Farm Wind TurbinesOnshore wind · 2.7 MW · Appeal Refused
- Chapelton FarmOnshore wind · 2.6 MW · Application Refused
- Neilston Additional Wind TurbineOnshore wind · 2.5 MW · Planning Permission Expired
- Castlemilk and Carmunnock Community Windpark TrustOnshore wind · 2.5 MW · Application Refused
- Damhead FarmOnshore wind · 2.5 MW · Operational
- GlaxoSmithKline Wind Project (Turbine 4)Onshore wind · 2.5 MW · Operational
- Hazelside farmOnshore wind · 2.4 MW · Revised
- LADEHEAD FARM - WIND TURBINESOnshore wind · 2.4 MW · Operational
- Ballochmartin Farm TurbineOnshore wind · 2.3 MW · Application Withdrawn
- BogsideOnshore wind · 2.3 MW · Application Refused
- Dykehead Farm wind turbine 3Onshore wind · 2.3 MW · Application Withdrawn
- Meall Mhor Wind FarmOnshore wind · 2.2 MW · Application Withdrawn
- Little KilmainOnshore wind · 2.2 MW · Application Withdrawn
- The Rosti FactoryOnshore wind · 2.2 MW · Operational
- Crutherland Farm Wind TurbineOnshore wind · 2 MW · Application Refused
- Tangy Farm Wind TurbineOnshore wind · 2 MW · Application Withdrawn
- Glenhove Pumping Station, Glenhove Road - Solar ArraySolar · 1.9 MW · Application Submitted
- Priestside FarmOnshore wind · 1.8 MW · Application Refused
- Myres HillOnshore wind · 1.8 MW · Operational
- Hillcrest FarmOnshore wind · 1.7 MW · Application Withdrawn
- Linburn FarmOnshore wind · 1.7 MW · Planning Permission Expired
- Linburn Farm (resubmission)Onshore wind · 1.7 MW · Revised
- Hazelside farmOnshore wind · 1.6 MW · Under Construction
- Low Ugadale FarmOnshore wind · 1.5 MW · Application Withdrawn
- Blairlinnans Water Treatment Plant, Stirling Road - Solar PV PanelsSolar · 1.3 MW · Application Withdrawn
- Forthside Way - Battery Storage UnitBattery storage · 1 MW · Awaiting Construction
- Yonderton Farm, Lesmahagow - Wind TurbineOnshore wind · 1 MW · Application Refused
- Tennant Avenue College, East Kilbride - Solar PanelsSolar · 0.9 MW · Under Construction
- Buchanan Gate, Stepps - Solar PanelsSolar · 0.9 MW · Under Construction
- Shipyard, Govan Road - Solar PanelsSolar · 0.8 MW · Awaiting Construction
- Mugdock Water Treatment Works - Solar panelsSolar · 0.8 MW · Operational
- Dfds Logistics, Middleton Avenue - Solar PanelsSolar · 0.7 MW · Awaiting Construction
- Craig Tara Holiday Park, Dunure Road - Solar PanelsSolar · 0.7 MW · Awaiting Construction
- Clyde Avenue, Bothwell - Solar ArraySolar · 0.7 MW · Awaiting Construction
- Overton Water Treatment Works, Old Largs Road By Overton - Solar PanelsSolar · 0.6 MW · Awaiting Construction
- Stevenston Sewage Treatment Works - Solar PanelsSolar · 0.6 MW · Awaiting Construction
- Tesco Stores, Greenock Road - Solar PV SystemSolar · 0.6 MW · Awaiting Construction
- Scottish Fire & Rescue Service, Westburn Drive - Solar Array & BESSSolar · 0.6 MW · Awaiting Construction
- Linn Products, Glasgow Road - Solar PanelsSolar · 0.5 MW · Awaiting Construction
- Fifty Pitches Place - Solar PanelsSolar · 0.5 MW · Awaiting Construction
- Cottrell Building, East Link Road - Solar PV PanelsSolar · 0.5 MW · Awaiting Construction
- Cambuslang Investment Park, Clydesmill Road - Solar panelsSolar · 0.5 MW · Awaiting Construction
- Lightyear Building, Marchburn Drive - Block A - Solar PanelsSolar · 0.4 MW · Application Submitted
- Harbro, Birkhill Commercial Park - Solar PanelsSolar · 0.4 MW · Awaiting Construction
- Greens Road, Blairlinn - Solar PanelsSolar · 0.4 MW · Awaiting Construction
- Glasgow Road, Blantyre - Solar PanelsSolar · 0.4 MW · Awaiting Construction
- Old Kilpatrick Service Reservoir, Mount Pleasant Road - Solar PanelsSolar · 0.4 MW · Awaiting Construction
- Westburn Drive, Cambuslang - Solar ArraySolar · 0.3 MW · Awaiting Construction
- Helen Street - Solar PanelsSolar · 0.3 MW · Awaiting Construction
- Marys Land, Tayvallich - Ground Mounted Solar PanelsSolar · 0.3 MW · Application Submitted
- Morrison Bowmore Distillery, Carlisle Street - Solar PanelsSolar · 0.3 MW · Revised
- Ladywell Avenue - Solar PanelsSolar · 0.3 MW · Awaiting Construction
- Sheriff Court Of Glasgow, Carlton Place - Solar PanelsSolar · 0.3 MW · Awaiting Construction
- Balmore Road - Solar PanelsSolar · 0.2 MW · Awaiting Construction
- Morrison Bowmore Distillery, Carlisle Street - Solar solar PV SystemSolar · 0.2 MW · Awaiting Construction
- Greenock Headworks, Eldon Street - Solar PanelsSolar · 0.2 MW · Awaiting Construction
- Allerdyce Road - Solar panelsSolar · 0.2 MW · Application Withdrawn
- International House, Stanley Boulevard - Solar ArraySolar · 0.2 MW · Awaiting Construction
- Glenegedale Lotts, Turbine Lotts - Solar Pv ArraySolar · 0.2 MW · Awaiting Construction
- Draffanmuir Farm - Wind TurbineOnshore wind · 0.2 MW · Application Submitted
- Helensburgh Waste Water Treatment Works, Moss Road - Solar PanelsSolar · 0.2 MW · Application Submitted
- Cartside Avenue, Inchinnan - Solar PanelsSolar · 0.2 MW · Awaiting Construction
- Cpi Medicines Manufacturing Centre, Netherton Square - Solar PanelsSolar · 0.2 MW · Awaiting Construction
- Bray Controls UK, Fountain Crescent - Solar PanelsSolar · 0.2 MW · Application Submitted
- Cunninghame Road, Farm Castle Industrial Estate - Solar PanelsSolar · 0.2 MW · Awaiting Construction
- Hollywood Bowl Showcase Leisure Park, Barrbridge Road - Solar ArraySolar · 0.2 MW · Awaiting Construction
- Carrochan Road, Balloch - Solar PanelsSolar · 0.2 MW · Under Construction
- Kilmarnock Academy, Elmbank Drive - Solar PV SystemSolar · 0.2 MW · Awaiting Construction
- Hutchesons Grammar SchoolSolar · 0.2 MW · Operational
- Glasgow High School, Crow Road - Solar PanelsSolar · 0.2 MW · Awaiting Construction
- The Curran Building, St James Road - Solar PanelsSolar · 0.2 MW · Awaiting Construction
- Finlaystone House, Estate Greenock Road - Solar PanelsSolar · 0.2 MW · Awaiting Construction
- Ionad Iomairt Thiriodh, Crossapol - Solar PanelsSolar · 0.2 MW · Awaiting Construction
- Heathland Wind FarmBattery storage · Awaiting Construction
- Clyde Gateway Developments Limited - D2 Grids Demonstrator ProjectSolar · Application Submitted
- Glasgow Airport Solar FarmBattery storage · Under Construction
- Loch Awe - Eredine Wind FarmBattery storage · Application Submitted
- Sainsburys, Kingsgate Retail Park - Solar ArraySolar · Application Submitted
- East Merkland Farm, Sandford - Wind TurbinesOnshore wind · Application Refused
- Hare Hill Wind Farm RepoweringBattery storage · Application Submitted
- Aldi Foodstore, Rigg Street - Solar PanelsSolar · Awaiting Construction
- Kilmaronock Millennium Hall Car Park - Ground Mounted Solar ArraySolar · Awaiting Construction
- Scottish Fire & Rescue Service, Westburn Drive - Solar Array & BESSBattery storage · Awaiting Construction
- Crawfurd Street - Solar PanelsSolar · Application Submitted
- Clyde Gateway Trade Park, Dalmarnock Road - Battery Energy StorageBattery storage · Application Submitted
- Moorfield North Industrial Park, MoorfieldSolar · Awaiting Construction
- Strathaven AirfieldSolar · Operational
- Elmbank Drive Solar PanelsSolar · Operational
- Duke Street Solar PanelsSolar · Awaiting Construction
- Dalmarnock Wastewater Treatment Works - Solar PanelsSolar · Awaiting Construction
- Stoneyhill Farm Wind turbinesOnshore wind · Application Withdrawn