← Back to Strathclyde

Solar · United Kingdom

Blairlinnans Water Treatment Plant, Stirling Road - Solar PV Panels

Operator Scottish Water

Application Withdrawn1.3 MWData checked 16 November 2026Source record dated 31 March 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Blairlinnans Water Treatment Plant, Stirling Road - Solar PV Panels is a 1.3 MW solar farm 5.1 km north-east of Alexandria, Strathclyde, United Kingdom. Its planning application (2024/0199/DET) went to West Dunbartonshire on 7 August 2024 and was withdrawn on 16 October 2025. Its status in the Renewable Energy Planning Database (UK government) is application withdrawn. There are 4 other energy sites within 10 km, 3 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 39 other sites and 243 energy sites within 40 km for Blairlinnans Water Treatment Plant, Stirling Road - Solar…

Members see the sites and incidents around this one, and every record behind them.

SCOTTISH WATER LIMITED (SC207004), active, since 2000. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
1.3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Withdrawn (Planning Application Withdrawn)
Operator or applicant
Scottish Water
Location
Blairlinnans Water Treatment Plant Stirling Road Balloch, Strathclyde, G83 8ND, United Kingdom
Planning authority
West Dunbartonshire
Planning application
2024/0199/DET

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 2024/0199/DET, with what the planning evidence pack adds for this site.

Every application in West Dunbartonshire · Alerts for applications and incidents near here

  • 7 August 2024 Planning application submitted
  • 16 October 2025 Application withdrawn

None found. The register holds no published incident that names Blairlinnans Water Treatment Plant, Stirling Road - Solar PV Panels. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Blairlinnans Water Treatment Plant, Stirling Road - Solar PV Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Blairlinnans Water Treatment Plant, Stirling Road - Solar PV Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Blairlinnans Water Treatment Plant, Stirling Road - Solar PV Panels?
Application Withdrawn, in the Renewable Energy Planning Database (UK government), where it last changed on 31 March 2026.
Where is Blairlinnans Water Treatment Plant, Stirling Road - Solar PV Panels?
5.1 km north-east of Alexandria, Strathclyde, United Kingdom (postcode G83 8ND).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).