← Back to Strathclyde
Planning pack for this site, £295Other options

Battery storage · United Kingdom

Glenhove Pumping Station, Glenhove Road - BESS

Operator Scottish Water

Awaiting Construction3.1 MWData checked 16 November 2026Source record dated 4 August 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Glenhove Pumping Station, Glenhove Road - BESS is a 3.1 MW battery storage site on the edge of Cumbernauld, Strathclyde, United Kingdom. Its planning application (26/00404/FUL) went to North Lanarkshire on 11 May 2026 and was granted on 1 June 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 26 other energy sites within 10 km, 4 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

SCOTTISH WATER LIMITED (SC207004), active, since 2000. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Glenhove Pumping Station, Glenhove Road - BESS sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 290 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool290 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells362 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire487 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Co-located with RE)
Capacity
3.1 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Scottish Water
Location
Glenhove Pumping Station Glenhove Road Carbrain, Strathclyde, G67 4AA, United Kingdom
Planning authority
North Lanarkshire
Planning application
26/00404/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 26/00404/FUL, with what the planning evidence pack adds for this site.

Every application in North Lanarkshire · Alerts for applications and incidents near here

Status changed from Application Submitted to Awaiting Construction on 16 November 2026.

  • 11 May 2026 Planning application submitted
  • 1 June 2026 Planning permission granted
  • 1 June 2029 Planning permission runs out

None found. The register holds no published incident that names Glenhove Pumping Station, Glenhove Road - BESS. If you know of one, report it (confidential reports are anonymised).

Has Glenhove Pumping Station, Glenhove Road - BESS had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Glenhove Pumping Station, Glenhove Road - BESS; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Glenhove Pumping Station, Glenhove Road - BESS?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 16 November 2026.
Where is Glenhove Pumping Station, Glenhove Road - BESS?
On the edge of Cumbernauld, Strathclyde, United Kingdom (postcode G67 4AA).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).