A fire broke out on Tuesday 17 November 2026 at the Orange data centre, a computer data storage facility in Val-de-Reuil, Eure, France. According to the report, the fire was of electrical origin and started in an electrical duct. The article describes it as a...
Data centre fires and power failures
As of 21 November 2026, the Energy Incident Register records 181 data centre incidents worldwide in 41 countries, 23 of them in 2026.
Counted from the register on 21 November 2026.
Key facts
- 181 data centre incidents in public reporting, 2010 to 2026, in 41 countries, each with its sources.
- 59 are fires or thermal events; the rest are power failures in the electrical systems.
- 18 are dated 2025 and 23 are dated 2026 so far.
- 74 name the UPS, its batteries or the battery room, the part named most often.
Counts are of entries in published reporting, not rates. The register is new and has been filling in its archive, so a rise across years measures the register before it measures the world.
Every data centre incident in public reporting that started in the power systems: UPS and battery rooms, backup generators, switchgear, transformers and fuel. Each entry says what happened and lists its sources. Free to read.
Get the next data centre fire or power failure by email
181 entries so far, 55 since 2024. Confirm your email and the full list arrives as a spreadsheet (CSV): reference, year, country, what failed, what happened and the source for every entry. One email when a new incident is reported, at most two a day, plus a Monday digest. Free, no account needed, unsubscribe in one click.
Data centre incidents: a quick heads-up first, then the confirmed details.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By subscribing you agree to the privacy policy.
See what a full record shows →
Every data centre incident
Newest incident first. Search them, or narrow them by country, year or severity. Each entry is free to read, with what happened and its sources; the record behind it adds the cause where it is established, the part that failed, the downtime and the loss.
On 19 October 2026, a power outage at a data centre in northern Portugal operated by SPMS, the agency responsible for the Ministry of Health's shared technology systems, took several computer systems offline across the National Health Service (SNS). According...
On a Wednesday afternoon in October 2026, a smouldering fire broke out in a battery installation at a data centre on Nonnendammallee in Spandau, Berlin, according to BZ Berlin. The fire did not start in the server room but in an adjacent technical area....
See what failed, why, and what it cost
The record behind each entry: the manufacturer, integrator and operator, root cause, failure mode, downtime, losses and every source.
Drones attacked a Yandex data centre in the Vladimir region of Russia on 11 October 2026, according to Yandex, which said its infrastructure was damaged and the data centre had been completely shut down. Yandex said no one was injured, but some of its...
A fire broke out in a building in Sasovo, Ryazan Region, Russia, that houses the Sasta machine-tool plant and a Yandex data centre, according to reports dated 8 October 2026. Yandex said the fire resulted from a drone attack and affected part of the data...
A fire broke out on Tuesday 29 September 2026 at a data centre in the Gasan-dong area of Geumcheon-gu, Seoul, South Korea. Firefighters were called at 11:55 am. Geumcheon Fire Department sent 80 officers and 14 fire engines, and the fire was extinguished by...
On 11 September 2026, roughly 5,500 gallons of diesel fuel leaked from a storage tank at an Equinix data centre on Hartz Way in Secaucus, New Jersey, according to local reports. The fuel flowed into Anderson Creek, a tributary of the Hackensack River. Equinix...
The University of Lagos (UNILAG) temporarily shut down one of its data centres in Lagos, Nigeria, after an early-morning fire on Monday 10 August 2026. The university's communication unit said the shutdown allowed safety assessments, technical inspections and...
On Sunday 5 July 2026, MTN Uganda said a major power failure at one of its data centres disrupted voice calls, mobile data and MTN MoMo mobile money services. Subscribers in different parts of Uganda reported being unable to make or receive calls, access data...
A large fire broke out at the NorthC data centre on Rondebeltweg in Almere on 7 May. Emergency services responded with multiple appliances and ladder trucks. The fire affected the rear of the building where technical facilities are located. The building was...
On 1 April 2026, Bahrain's interior minister said the defence force was extinguishing a fire at a company facility as a result of Iranian aggression, without naming the firm. Citing the Financial Times, Data Center Dynamics reported that the facility was an...
At about 19:30 on Monday 2 March 2026 the power failed at the data centre of the municipal IT service provider Regio IT in Aachen, Germany. The emergency generator started, but it did not prevent damage. A central network component failed and the systems went...
On 1 March 2026, at around 4:30am Pacific time (4:30pm UAE time), one Availability Zone, mec1-az2, in Amazon Web Services' ME-CENTRAL-1 region in the UAE was impacted by objects that struck the data centre, creating sparks and fire. AWS initially reported...
Smoke was reported at Istiqlal Mosque on Jalan Taman Wijaya Kusuma in Pasar Baru, Central Jakarta, on the evening of 18 February 2026, during the first congregational tarawih prayers of Ramadan 1447. Fire service officers said the smoke came from a fire in an...
On 7 February 2026, one data centre within Microsoft's West US cloud region in California, United States, lost power. According to a post incident report that Microsoft published, an electrical failure in an on-site transformer caused the loss of utility...
A transformer explosion was reported at about 10:20 p.m. on Friday 27 February 2026 near Wiseman Boulevard and Luckenbach Road in San Antonio, close to Vantage Data Centers. Police said one construction worker was found with critical injuries. The transformer...
In the early hours of Saturday 24 January 2026, a fire broke out in a battery room at a commercial building on Nutmeg Lane in Blackwall, east London. The building is a 13-storey tower housing a data centre. The London Fire Brigade received the first call at...
According to a report published by the Diario Expreso newspaper on Facebook on 2 November 2026, an electrical overload triggered a fire scare in the data centre of an identification agency. The headline states that the incident halted in-person and virtual...
Nscale's data centre project at Glomfjord, Norway, is reportedly running six months behind schedule, according to a Bloomberg report citing people close to the project and public records, as relayed by DatacenterDynamics. The reported problems include...
A Channel 3000 news video published on 20 July 2026 was titled as a data centre fire that had been put out. The published page does not report the place, the operator, the cause, any injuries, or whether power equipment was involved.
For a data centre insurer, broker or operator team
Team
- The full record behind every data centre entry, and every other entry on the register, for 5 people
- The spreadsheet export, to filter and count in your own files
- Ask the register any question and get a sourced answer
- A quarterly briefing by email
Paid by card, your email first; or by invoice: support@energyincidentregister.com. For one person: 7 days of everything free with your email, no card, then £39 a month (plans). Everything for companies.
Example
See what a record holds before you pay: two complete records are open to everyone.
The Energy Incident Register is a data contributor to the PV Fire Intelligence Network (PV-FIN), led by BRE. As cited by DatacenterDynamics.
- Where the reporting names the part that failed, UPS and battery rooms come up most often: 74 of the 181 entries, then backup generators (57).
- 59 of the 181 entries are fires or thermal events, and 22 are classed as major.
- 55 of the 181 entries are dated 2024 or later.
What the record adds
Every entry on this page is free to read. The record behind each one adds the fields an analyst needs, read from the sources and checked against them. Across the 181 data centre entries it holds:
| Field | Entries |
|---|---|
| Operator | 128 of 181 |
| Root cause | 133 of 181 |
| The part that failed | 126 of 181 |
| Services that went down | 115 of 181 |
| Type of facility (cloud, colocation, enterprise, government, telecom) | 130 of 181 |
| Fire service response | 54 of 181 |
| Exact date | 129 of 181 |
| How long the outage lasted | 84 of 181 |
| Battery chemistry | 5 of 181 |
The newest, with the record
| Entry | Type of facility | Outage | Root cause |
|---|---|---|---|
| Electrical duct fire at Orange data centre in Val-de-Reuil | Not stated | Not stated | •••••••••••••• |
| Electrical overload triggers fire scare at identity agency data centre | Not stated | Not stated | •••••••••••••• |
| Power outages at Portuguese health data centre disrupt national prescriptions | Not stated | Not stated | •••••••••••••• |
| Smouldering fire in battery system at Berlin data centre | Not stated | Not stated | •••••••••••••• |
| Drone attack reported to shut down Yandex data centre in Vladimir region, Russia | Not stated | Not stated | •••••••••••••• |
| UPS battery fire in server room at Istiqlal Mosque, Jakarta | •••••••• | Not stated | •••••••••••••• |
Open every record for 7 days free with , or £39 a month. See a complete record first. For a weekly file or the API, the data licence.
What failed
Counted from the words of the reporting itself. An entry is counted under each part its reporting names, and "Not stated" means the public reporting did not say.
| Part named in the reporting | Entries | |
|---|---|---|
| UPS and battery rooms | 74 | |
| Backup generators | 57 | |
| Switchgear and electrical rooms | 31 | |
| Transformers and substations | 19 | |
| Fuel systems | 6 | |
| Not stated | 56 |
By year
| Year of the incident | Entries | |
|---|---|---|
| 2026 | 23 | |
| 2025 | 18 | |
| 2024 | 14 | |
| 2023 | 16 | |
| 2022 | 13 | |
| 2021 | 7 | |
| 2020 | 6 | |
| 2019 | 9 | |
| 2018 | 11 | |
| 2017 | 10 | |
| 2016 | 12 | |
| 2015 | 6 | |
| 2014 | 5 | |
| 2013 | 4 | |
| 2012 | 11 | |
| 2011 | 6 | |
| 2010 | 10 |
By country
| Country | Entries | |
|---|---|---|
| United States | 49 | |
| United Kingdom | 21 | |
| France | 12 | |
| Germany | 10 | |
| Australia | 10 | |
| South Korea | 9 | |
| Japan | 8 | |
| India | 6 | |
| Singapore | 4 | |
| Canada | 4 | |
| Nigeria | 3 | |
| Netherlands | 3 | |
| South Africa | 3 | |
| Russia | 2 | |
| Indonesia | 2 | |
| Belgium | 2 | |
| Brazil | 2 | |
| Italy | 2 | |
| Taiwan | 2 | |
| Portugal | 1 | |
| Norway | 1 | |
| Uganda | 1 | |
| Ireland | 1 | |
| Bahrain | 1 | |
| United Arab Emirates | 1 | |
| Hong Kong | 1 | |
| Egypt | 1 | |
| Sweden | 1 | |
| Nepal | 1 | |
| Bangladesh | 1 | |
| Malaysia | 1 | |
| Spain | 1 | |
| Iran | 1 | |
| Philippines | 1 | |
| Czech Republic | 1 | |
| Saudi Arabia | 1 | |
| Haiti | 1 | |
| China | 1 | |
| Switzerland | 1 | |
| Tanzania | 1 | |
| New Zealand | 1 | |
| Not stated | 5 |
The major incidents
The entries the register classes as major: the longest outages, the worst damage and the incidents where people were hurt.
How often do data centre fires happen?
On this register: 16 incidents in 2023 (6 of them fires), 14 incidents in 2024 (6 of them fires), 18 incidents in 2025 (8 of them fires), and 23 so far in 2026. These are the incidents that reached public reporting, written up with their sources.
Two older figures are often quoted. Uptime Institute counted 11 fires among more than 8,000 incidents its members reported from 1994, under half a fire a year. An opinion piece in DatacenterDynamics counted 31 reports of data centre fires from June 2003 to March 2021. The counts differ because each list holds something different: Uptime's comes from its members, the DCD figure from news reports of fires, and this register from public reporting of fires and power failures in the power systems, kept up every day.
The major data centre fires
OVHcloud, Strasbourg, 2021 EIR-1848
At about 00:40 on 10 March 2021 a fire broke out in the power supply room of the SBG2 data centre on the OVHcloud site in Strasbourg. Firefighters reported electrical arcs, and power could not be isolated promptly, which the reporting links to the fire spreading. OVHcloud data centre fire destroys SBG2 in Strasbourg.
SK C&C Pangyo (Kakao), South Korea, 2022 EIR-0888
19 pm in a battery room on the third basement floor of the SK C&C data centre in Pangyo, Gyeonggi, South Korea. The batteries were used for backup power. Battery room fire at SK C&C Pangyo data centre disrupts Kakao services.
The state data centre in Daejeon, South Korea, 2025 EIR-1893
A fire broke out on the evening of 26 September 2025 in a server room on the fifth floor of the National Information Resources Service (NIRS) data centre in Daejeon, South Korea. Officials suspect the fire began when a lithium-ion battery exploded during maintenance work to move backup power battery modules to the basement. Lithium battery fire at South Korean state data centre disrupts government services.
Digital Realty SIN11, Loyang, Singapore, 2024 EIR-0116
A fire alarm was triggered at SIN11 Digital Loyang 1, a multi-storey data centre at 3 Loyang Way, Loyang, Singapore, operated by Digital Realty, after an explosion occurred in a lithium-ion battery energy storage system used for uninterruptible power supply, located in battery rooms on the third floor. Approximately 20 occupants evacuated before fire crews arrived, and all site workers were evacuated shortly after the alarm. Explosion and multi-day fire at SIN11 Digital Loyang 1 data centre, Singapore.
Maxnod, France, 2023 EIR-0629
A fire severely damaged the Maxnod data centre at Saint-Trivier-sur-Moignans in the Ain department of France on 28 March 2023, and the facility was taken offline. The 800 square metre building's structure was reported as compromised, and initial estimates said its network and electrical infrastructure was destroyed. Fire severely damages Maxnod data centre in Saint-Trivier-sur-Moignans, France.
Telecom Egypt, Cairo, 2025 EIR-1867
On 7 July 2025 a fire broke out in an equipment room at the Ramses switchboard of Telecom Egypt, on the seventh floor of a 10-storey building in the Ramses area of Cairo. The fire lasted for hours. Fire at Telecom Egypt data centre kills four and injures 26.
Almere, Netherlands, 2026 EIR-1887
A large fire broke out at the NorthC data centre on Rondebeltweg in Almere on 7 May. Emergency services responded with multiple appliances and ladder trucks. Fire at Almere data centre causes power loss and outages.
Reliance Jio, India, 2024 EIR-1875
On 17 September 2024, Yahoo Finance Singapore reported that a fire at a data centre had caused an India-wide outage for Reliance Jio users, citing an unnamed source. The report does not name the data centre, say where in India it was, or describe which equipment was involved. Reported fire at a data centre disrupts Reliance Jio network across India.
East London lead-acid battery fire, 2026 EIR-1889
In the early hours of Saturday 24 January 2026, a fire broke out in a battery room at a commercial building on Nutmeg Lane in Blackwall, east London. The building is a 13-storey tower housing a data centre. Lead acid battery fire at east London data centre tower.
Data centre fires by country
- United States: 49 entries, 10 of them fires; the latest is Transformer failure and control fault cause Azure data centre power loss (EIR-2254, 2026).
- United Kingdom: 21 entries, 3 of them fires; the latest is Lead acid battery fire at east London data centre tower (EIR-1889, 2026).
- France: 12 entries, 7 of them fires; the latest is Electrical duct fire at Orange data centre in Val-de-Reuil (EIR-2929, 2026).
- Australia: 10 entries, 2 of them fires; the latest is UPS fault causes power loss at Vocus data centre in Melbourne (EIR-2268, 2023).
- Germany: 10 entries, 2 of them fires; the latest is Smouldering fire in battery system at Berlin data centre (EIR-2508, 2026).
- South Korea: 9 entries, 6 of them fires; the latest is Fire in UPS room at Seoul data centre during electrical testing (EIR-2259, 2026).
- Japan: 8 entries, 1 of them fires; the latest is Lead-acid UPS battery fire at data centre in Chiba, Japan (EIR-2264, 2024).
- India: 6 entries, 3 of them fires; the latest is Fire at data centre causes Google Cloud outage in India (EIR-1959, 2026).
- Canada: 4 entries, 0 of them fires; the latest is Power cut during fire alarm test takes down Canadian prison data centre (EIR-2351, 2017).
- Singapore: 4 entries, 1 of them fires; the latest is Equipment failure during maintenance cuts power to two Equinix SG1 data halls (EIR-2258, 2025).
- Netherlands: 3 entries, 1 of them fires; the latest is Fire at Almere data centre causes power loss and outages (EIR-1887, 2026).
- Nigeria: 3 entries, 2 of them fires; the latest is University of Lagos data centre fire halts internet and e-services (EIR-1956, 2026).
- South Africa: 3 entries, 0 of them fires; the latest is Generator failure during load shedding causes data centre power feed outage (EIR-2263, 2024).
Lithium-ion and UPS battery fires
74 entries name the UPS, its batteries or the battery room, and 5 of all data centre entries name lithium-ion batteries; lead-acid UPS batteries appear too. Every UPS and battery room fire at a data centre, and the backup generator failures.
For underwriters: the record behind every data centre entry adds the operator, the root cause where it is established, the part that failed, the services that went down and how long the outage lasted. The week pass opens every record; Team suits an underwriting team.
Questions answered
How many data centre fires have there been?
The register holds 181 data centre incidents from public reporting, 2010 to 2026, in 41 countries. 59 of them are fires or thermal events; the rest are power failures, explosions, gas releases and electrical injuries in the power systems. These are the incidents that reached public reporting; many smaller ones never do.
What causes most data centre fires?
Where the public reporting names the part that failed, the most common is UPS and battery rooms (74 entries), followed by backup generators (57) and switchgear and electrical rooms (31). In 56 entries the reporting does not say what failed.
Do lithium-ion UPS batteries cause data centre fires?
5 entries name lithium-ion batteries, including Lithium battery fire at South Korean state data centre disrupts government services (EIR-1893, 2025); Battery room fire at Digital Realty data centre in Hillsboro, Oregon (EIR-0106, 2025); Explosion and multi-day fire at SIN11 Digital Loyang 1 data centre, Singapore (EIR-0116, 2024). Lead-acid UPS batteries appear too. Each entry gives the source for what was said.
Which data centre incidents were the most serious?
22 of the 181 entries are classed as major, among them Transformer explosion near Vantage Data Centers injures worker in San Antonio (EIR-1984, 2026); Strikes on Amazon Web Services UAE data centre cause fire and power loss (EIR-1896, 2026); Lithium battery fire at South Korean state data centre disrupts government services (EIR-1893, 2025). The full list is on this page.
Where do data centre fires happen most?
In the reporting the register has found, United States (49), United Kingdom (21), France (12) have the most entries. That partly reflects where data centres are built and where the press reports on them.
Is there a list of data center fires?
Yes. This page lists every data centre (data center) fire and power failure the register has published, 181 entries from 2010 to 2026, each with its sources, free to read and cite. It is rebuilt from the register as new incidents are published.
How often do data centre fires happen?
In public reporting, the register holds 16 incidents in 2023, 14 in 2024, 18 in 2025 and 23 so far in 2026, fires and power failures together; 59 of its 181 data centre entries are fires. Older figures are lower because they counted less: Uptime Institute counted 11 fires among its members' reports from 1994, and an opinion piece in DatacenterDynamics counted 31 fire reports from 2003 to 2021.
What was the biggest data centre fire?
The OVHcloud fire in Strasbourg (EIR-1848): At about 00:40 on 10 March 2021 a fire broke out in the power supply room of the SBG2 data centre on the OVHcloud site in Strasbourg. Firefighters reported electrical arcs, and power could not be isolated promptly, which the reporting links to the fire spreading. The SK C&C Pangyo fire in South Korea (EIR-0888) took down Kakao's services: 19 pm in a battery room on the third basement floor of the SK C&C data centre in Pangyo, Gyeonggi, South Korea. The batteries were used for backup power.
Have there been data centre fires in the UK?
Yes. The register holds 21 data centre incidents in the United Kingdom, 3 of them fires; the latest is Lead acid battery fire at east London data centre tower.
What this page covers, and what it does not
The register records incidents in a data centre's power systems, because those are the parts that share their failure modes with battery storage and the grid: lithium-ion and lead-acid UPS batteries, diesel generators and their fuel, switchgear and transformers. A software outage or a cooling fault with no fire or power failure is not recorded here.
Public reporting on data centre fires often names the operator but rarely the battery chemistry, the UPS make or the cause. The register does not guess them. Where a fire service, regulator or the operator states one, the entry carries it and says who said it.
If you run data centres or insure them and want a field added, tell us what it should be.
How the count has changed
| Date | Entries | Countries | Where |
|---|---|---|---|
| 12 October 2026 | 93 | 26 | DatacenterDynamics published these figures from the register. |
| 21 November 2026 | 181 | 41 | Today, from the live register. |
Counts change for three reasons: new incidents are added as they are reported, older incidents are added as the archive is worked through, and entries found to describe the same event are merged into one. On 12 October this page showed 92. One entry, a second write-up of the 2016 Global Switch GS2 power fault (EIR-1992), had been merged into EIR-1996 on the site, but the register's database and API still counted it until 13 October, so they gave 93.
For data centre operators, their insurers and lenders
A submission tells you what the broker chose to include. The register tells you what has been reported about the site, the operator and the equipment, with the source for every line, and an estimated cost and downtime range where no figure was published.
Free: what happened
Each entry: the site and operator where the source names them, what happened, the contributing factors, the lessons and every source. Never a person. A spreadsheet of the whole set arrives when you confirm an alert sign-up on this page.
The record: what failed and what it cost
For subscribers, the record behind an entry adds the cause where it is established, the part that failed, the downtime and the estimated loss with a confidence band. Two complete records are open to everyone.
Modelling data centre power risk? Every data centre incident as data, by spreadsheet, weekly file or API: a free 20-record sample and a 3-month pilot.
Get the next data centre fire or power failure by email
181 entries so far, 55 since 2024. Confirm your email and the full list arrives as a spreadsheet (CSV): reference, year, country, what failed, what happened and the source for every entry. One email when a new incident is reported, at most two a day, plus a Monday digest. Free, no account needed, unsubscribe in one click.
Data centre incidents: a quick heads-up first, then the confirmed details.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By subscribing you agree to the privacy policy.
How to use this
- Every entry is free to read: browse the data centre entries, or see the data centre hub.
- Get an email when a new data centre incident is published: incident alerts, free.
- Cite an entry by its reference, for example EIR-1848, and link it. Attribution is all we ask.
- Pull the same data over the API.
- If an entry is wrong, the correction is free, for anyone.
Related: battery storage fires, solar farm fires, wind turbine fires and substation and transformer fires.