Lead acid battery fire at east London data centre tower
Jan 2026Published 2 Oct 2026Updated 13 Oct 2026Responsible editor: Chief Editor
Get the next one by email
Free alerts on data centre incidents in the United Kingdom, and an email when EIR-1889 is updated. No account needed; unsubscribe in one click.
Confirm your email and every data centre incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
What happened
In the early hours of Saturday 24 January 2026, a fire broke out in a battery room at a commercial building on Nutmeg Lane in Blackwall, east London. The building is a 13-storey tower housing a data centre. The London Fire Brigade received the first call at 04:52 and mobilised eight fire engines and around 60 firefighters from Poplar, Millwall, Plaistow, Stratford, East Ham and East Greenwich fire stations, because the fire was in a high-rise building.
The brigade said the fire was limited to a string of lead acid batteries, with no further damage to the building and no injuries reported. The fire was brought under control by 06:43. The brigade believes the fire was accidental and was caused by the failure of one of the batteries. One outlet reported that part of a basement battery room, storing around 200 lead acid batteries, was destroyed by fire.
Contributing factors
The London Fire Brigade believes the failure of one lead acid battery caused the fire. Reports differ on the location of the battery room, with some describing a basement room and others describing the tower more generally. The cause had not been formally determined in some early reports.
Lessons learned
- Monitor lead acid battery strings and replace failing units on a planned schedule, because a single failed battery can start a fire.
- Fit battery rooms with fire detection, suppression and containment so that a single failure stays limited, particularly in basements and high-rise buildings.
- Agree access, layout and hazard information with the local fire brigade in advance so that the response is proportionate and quick.
More lessons on detection and monitoring, fire suppression and firefighting, from every incident on the register.
Source
Published 2026-10-02. Written from public reporting. Descriptive, not investigative. See the data accuracy disclaimer.