← Back to London

Solar · United Kingdom

Alcatel, Telegraph House - Solar Panels

Operator Private Developer

Application Refused1.3 MWData checked 16 November 2026Source record dated 2 December 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Alcatel, Telegraph House - Solar Panels is a 1.3 MW solar farm on the edge of Charlton, London, United Kingdom. Its planning application (25/3119/PN3) went to Greenwich on 18 September 2025 and was refused on 30 October 2025. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 122 other energy sites within 10 km, 74 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 409 other sites and 832 energy sites within 40 km for Alcatel, Telegraph House - Solar Panels

Members see the sites and incidents around this one, and every record behind them.

PRIVATE DEVELOPER NETWORK LIMITED (09386318), dissolved, since 2015. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
1.3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Refused (Planning Permission Refused)
Operator or applicant
Private Developer
Location
Alcatel, Telegraph House, 10 Telcon Way, Greenwich, London, SE10 0AG, United Kingdom
Planning authority
Greenwich
Planning application
25/3119/PN3

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 25/3119/PN3, with what the planning evidence pack adds for this site.

Every application in Greenwich · Alerts for applications and incidents near here

  • 18 September 2025 Planning application submitted
  • 30 October 2025 Planning permission refused

None found. The register holds no published incident that names Alcatel, Telegraph House - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Alcatel, Telegraph House - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Alcatel, Telegraph House - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Alcatel, Telegraph House - Solar Panels?
Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 2 December 2025.
Where is Alcatel, Telegraph House - Solar Panels?
On the edge of Charlton, London, United Kingdom (postcode SE10 0AG).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).