Fire at Telstra London Hosting Centre cuts power to half of building
Aug 2020Published 5 Oct 2026Updated 13 Oct 2026Responsible editor: Chief Editor
Get the next one by email
Free alerts on data centre incidents in the United Kingdom, and an email when EIR-2006 is updated. No account needed; unsubscribe in one click.
Confirm your email and every data centre incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
What happened
On 27 August 2020, a fire broke out in a supply room on the third floor of the Telstra London Hosting Centre at 6 Greenwich View Place, on the Isle of Dogs, London. London Fire Brigade sent four fire engines and around 25 firefighters and reported that only a small part of the supply room was damaged. The fire tripped the bus bar breakers and the lower half of the nine-storey building, which offers about 114,000 square feet of data centre space, lost its power supply, which Telstra described as its green system.
Engineers worked to restore power by generator. Telstra's helpline and an industry observer reported that powered equipment in the building went offline in the morning. No injuries were reported.
Contributing factors
Unconfirmed press reports suggested the fire was caused by a faulty uninterruptible power supply (UPS). Neither the operator nor the fire service confirmed this cause at the time of reporting.
Lessons learned
- Operators should monitor UPS and power room equipment for heat and fault signs, and inspect it on a fixed schedule, because UPS fires are a recognised risk in data centres.
- Protection and breaker arrangements should isolate a fault to a single section, so that a fire in one room does not take down the power supply to half a building.
- Generator restoration and switchover procedures should be rehearsed so that power can be recovered quickly after an electrical fire.
More lessons on detection and monitoring, electrical protection and isolation, worker safety and safe systems of work, from every incident on the register.
Source
Published 2026-10-05. Written from public reporting. Descriptive, not investigative. See the data accuracy disclaimer.