Data centreUnited StatesEIR-1882

Electrical failure and small fire at Delta data centre in Atlanta

Aug 2016Published 2 Oct 2026Updated 13 Oct 2026Responsible editor: Chief Editor

Estimated damageEstimated by the register's adjusterHow? Know the real figure?
Figure hidden: shown to subscribersMedium confidence
out of service for about •• daysShown in the record →Full estimate
From the recordRoot cause hiddenFailed part hidden

Companies named in the reporting of this entry (being named is not a finding of fault): Delta Air Lines, Georgia Power

On Monday 8 August 2016, an electrical component failed at Delta Air Lines' Atlanta headquarters, Georgia, and the transformer supplying power to the airline's data centre shut down. The data centre moved to backup power, but not all servers were connected to that source, and a cascading failure followed. Delta said the initial equipment failure sparked a small fire that was put out immediately, and that the fire department was not called.

The airline declined to detail the extent of the fire or any damage to equipment or servers. Georgia Power, the local utility, said a switchgear malfunctioned for reasons not immediately clear and that the problem did not affect its other customers. The outage began around 2:30 a.m. EDT. Delta cancelled 451 flights that day, and flights gradually resumed about six hours later. Over the following days the airline cancelled more than 2,100 flights, and systems ran slower than normal after recovery.

Some core and key systems did not transfer to the backup power source when mains power was lost, so a redundant supply did not protect the whole system. The initial failure was an electrical component at the transformer or switchgear, as stated by the airline and the utility. The cause had not been finally determined at the time of reporting.

  1. Confirm that every critical system and server is connected to backup power, and test automatic transfer under realistic load, not only at component level.
  2. Monitor and maintain transformers and switchgear, and plan for a fault that cuts off both utility and backup supply to the same switchboard.
  3. Prepare documented fire response and recovery procedures for power failures, including communications with customers and staff during a whole-system outage.

More lessons on outages, backup supply and restoration, detection and monitoring, worker safety and safe systems of work, from every incident on the register.

Published 2026-10-02. Written from public reporting. Descriptive, not investigative. See the data accuracy disclaimer.

See the register's stories first in Google: add it as a preferred source.

Chart to reuse with this story: Data centre incidents in the United States, by year, free with a credit (PNG).

Data centre incidents in the United States: 49 entries, with a free alert for the next one.

See switchgear and electrical room fires at data centres.

Browse the full register or submit an incident.