Electrical failure and small fire at Delta data centre in Atlanta
Aug 2016Published 2 Oct 2026Updated 13 Oct 2026Responsible editor: Chief Editor
Get the next one by email
Free alerts on data centre incidents in the United States, and an email when EIR-1882 is updated. No account needed; unsubscribe in one click.
Confirm your email and every data centre incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Companies named in the reporting of this entry (being named is not a finding of fault): Delta Air Lines, Georgia Power
What happened
On Monday 8 August 2016, an electrical component failed at Delta Air Lines' Atlanta headquarters, Georgia, and the transformer supplying power to the airline's data centre shut down. The data centre moved to backup power, but not all servers were connected to that source, and a cascading failure followed. Delta said the initial equipment failure sparked a small fire that was put out immediately, and that the fire department was not called.
The airline declined to detail the extent of the fire or any damage to equipment or servers. Georgia Power, the local utility, said a switchgear malfunctioned for reasons not immediately clear and that the problem did not affect its other customers. The outage began around 2:30 a.m. EDT. Delta cancelled 451 flights that day, and flights gradually resumed about six hours later. Over the following days the airline cancelled more than 2,100 flights, and systems ran slower than normal after recovery.
Contributing factors
Some core and key systems did not transfer to the backup power source when mains power was lost, so a redundant supply did not protect the whole system. The initial failure was an electrical component at the transformer or switchgear, as stated by the airline and the utility. The cause had not been finally determined at the time of reporting.
Lessons learned
- Confirm that every critical system and server is connected to backup power, and test automatic transfer under realistic load, not only at component level.
- Monitor and maintain transformers and switchgear, and plan for a fault that cuts off both utility and backup supply to the same switchboard.
- Prepare documented fire response and recovery procedures for power failures, including communications with customers and staff during a whole-system outage.
More lessons on outages, backup supply and restoration, detection and monitoring, worker safety and safe systems of work, from every incident on the register.
Source
Published 2026-10-02. Written from public reporting. Descriptive, not investigative. See the data accuracy disclaimer.