Lightning strikes cause Google data centre power loss in Belgium
Aug 2015Published 2 Oct 2026Updated 13 Oct 2026Responsible editor: Chief Editor
Get the next one by email
Free alerts on data centre incidents in Belgium, and an email when EIR-1883 is updated. No account needed; unsubscribe in one click.
Confirm your email and every data centre incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Companies named in the reporting of this entry (being named is not a finding of fault): Google
What happened
At 09:19 PDT on 13 August 2015, four successive lightning strikes hit the local utilities grid supplying Google's European data centre in St. Ghislain, Belgium, within the europe-west1-b zone. The strikes caused a brief loss of power to storage systems hosting Google Compute Engine persistent disk capacity. Automatic auxiliary systems restored power quickly and the storage systems have battery backup, but some recently written data sat on storage systems more susceptible to power failure from extended or repeated battery drain.
Roughly 5% of Standard Persistent Disks in the zone had at least one I/O failure, and manual intervention was needed to return systems to normal serving state. Recovery continued until 17 August 2015, when a very small fraction of disk space, under 0.000001%, had permanent data loss. SSD Persistent Disks, snapshots and Local SSDs were not affected.
Contributing factors
The storage systems that held recently written data were more susceptible to power failure from extended or repeated battery drain. Google's review identified several contributing factors across the hardware and software stack, which the company said it is working to address. Google stated that its own hardware upgrade programme was ongoing and that most Persistent Disk storage was already on less susceptible hardware.
Lessons learned
- Repeated grid disturbances such as successive lightning strikes can exhaust battery backup, so backup endurance should be tested against repeated interruptions, not only a single outage.
- Identify which storage tiers hold recently written data that is most exposed to a power interruption, and prioritise those for hardware upgrades.
- Where data is critical, keep snapshots and geographically replicated copies, because a single facility or zone can fail as a whole.