Google Cloud data centre power failure causes cooling outage
2026Published 5 Oct 2026Responsible editor: Chief Editor
Get the next one by email
Free alerts on data centre incidents worldwide, and an email when EIR-2004 is updated. No account needed; unsubscribe in one click.
Confirm your email and every data centre incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Companies named in the reporting of this entry (being named is not a finding of fault): Google Cloud
What happened
Three Google Cloud services experienced a 15-hour outage after a power failure in the datacentre serving the europe-west4-a zone. An electrical fault on the utility grid upstream of the datacentre disrupted electrical distribution gear and cooling equipment. The DRUPS back-up power system for one side failed to take over due to electrical component failures. A chiller controller dropped offline, the redundant chilled water source was unavailable due to construction, and temperatures reached 44°C, leading to machine shutdowns. Workloads were turned down to protect data.
Contributing factors
Upstream utility grid fault, failure of DRUPS transfer due to component failures and load deployment discrepancy, chiller controller failure during voltage transient, redundant cooling source unavailable due to ongoing construction.
Lessons learned
- Verify that managed services advertised as zone-resilient do not have single-datacentre dependencies.
- Ensure backup power transfer systems are tested under realistic transient conditions.
- Maintain redundant cooling sources even during construction work at facilities.
More lessons on outages, backup supply and restoration, from every incident on the register.