Fire at Khawaja Tower data centres in Dhaka, Bangladesh
Oct 2023Published 2 Oct 2026Updated 13 Oct 2026Responsible editor: Chief Editor
Get the next one by email
Free alerts on data centre incidents worldwide, and an email when EIR-1847 is updated. No account needed; unsubscribe in one click.
Confirm your email and every data centre incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
What happened
A fire broke out at about 16:58 local time on 26 October 2023 on a floor of Khawaja Tower, a 14-storey commercial building in the Mohakhali district of Dhaka. The tower housed several internet gateways, interconnection exchanges and two data centres, and multiple International Internet Gateways and data centres were reported destroyed. The Bangladesh Fire Service and Civil Defence reached the building at about 17:07 and brought the blaze under control around 19:30, with the fire fully extinguished the next morning.
Three people died and ten were reported injured. Several people reached the roof and were rescued. Around 40 percent of broadband users and about 20 percent of mobile internet users reported disruption, and an internet service provider association said bandwidth losses were 70 to 80 percent. The cause had not been announced, but the fire service suspected a short circuit.
Contributing factors
The fire service said the building had no fire safety plan and did not have extensive firefighting compliance. Extinguishers were present on several floors, but the fire spread because of a large amount of flammable material. A data centre operator's chief executive said existing data centres should not be housed in a building designed for commercial purposes, citing a lack of government regulation on data centre standards.
Lessons learned
- Data centres and interconnection equipment should be housed in purpose-built facilities with designed fire protection, not in commercial buildings designed for other uses.
- Operators should control the storage of flammable materials in and around electrical and telecom rooms and maintain a tested fire safety plan for the whole building.
- Critical interconnection capacity should be spread across separate sites so that a single building fire does not remove a large share of national connectivity.
More lessons on electrical protection and isolation, spacing, layout and fire spread, from every incident on the register.
Source