Fire at Windstream data centre in Lincoln knocks out Nebraska 911 services
Sept 2023Published 2 Oct 2026Updated 13 Oct 2026Responsible editor: Chief Editor
Get the next one by email
Free alerts on data centre incidents in the United States, and an email when EIR-1846 is updated. No account needed; unsubscribe in one click.
Confirm your email and every data centre incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Companies named in the reporting of this entry (being named is not a finding of fault): Windstream
What happened
A fire broke out at a Windstream data centre in Lincoln, Nebraska, on Saturday 2 September 2023. According to the reporting, the fire caused a transformer to short and explode, which took down power to the facility's two main switches. The backup generator started but failed shortly afterwards, leaving the site reliant on its battery backup. As the batteries ran down, Windstream shut down one of its switches that carried connectivity for 911 services in parts of southeast Nebraska.
Windstream told the Nebraska Public Service Commission that 911 service was down in Adams, Gage, Otoe and Saunders counties, and other counties may also have been affected. Windstream first notified the 911 centres at about 6:30 p.m. Service was restored early on Sunday 3 September after technicians worked overnight. Lincoln Fire and Rescue said the fire was caused by a water leak that reached electrical equipment.
Contributing factors
Lincoln Fire and Rescue attributed the fire to a water leak that reached electrical equipment. Reporting states that the backup generator failed shortly after starting and that the battery backup was depleted. The sources do not say why the backup systems failed, or whether the 911 circuits had a diverse second route.
Lessons learned
- Keep water away from energised transformers and switchgear, and fit leak detection and drainage in electrical rooms.
- Test backup generators under full load and confirm that batteries and fuel can carry the site through a prolonged outage.
- Where emergency call routing depends on a single facility, use diverse paths so that one site failure cannot remove 911 service across several counties.
More lessons on detection and monitoring, outages, backup supply and restoration, emergency response and public communication, from every incident on the register.
Source
Site page: Windstream (status, dates and other incidents)
Published 2026-10-02. Written from public reporting. Descriptive, not investigative. See the data accuracy disclaimer.