← Back to Strathclyde
Planning pack for this site, £295Other options

Solar · United Kingdom

Kilmaronock Millennium Hall Car Park - Ground Mounted Solar Array

Operator KCT

Awaiting ConstructionData checked 16 November 2026Source record dated 24 February 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Kilmaronock Millennium Hall Car Park - Ground Mounted Solar Array is a solar farm 6.7 km north-east of Alexandria, Strathclyde, United Kingdom. Its planning application (2025/0291/DET) went to West Dunbartonshire on 5 November 2025 and was granted on 23 December 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 4 other energy sites within 10 km, 3 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Kilmaronock Millennium Hall Car Park - Ground Mounted Solar Array sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1238, Leak from solar heating system at Carnegie Leisure Centre Dunfermline, 66 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12382019Leak from solar heating system at Carnegie Leisure Centre Dunfermline66 kmMinor
EIR-14762026House fire reported to have started on solar panels in Carnoustie123 kmSignificant
EIR-20162022Solar panel fire evacuates Hawick High School129 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
KCT
Location
Btw Kilmaronock Millennium Hall Car Park And A811, Gartocharn, Alexandria, Strathclyde, G83 8NF, United Kingdom
Planning authority
West Dunbartonshire
Planning application
2025/0291/DET

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 2025/0291/DET, with what the planning evidence pack adds for this site.

Every application in West Dunbartonshire · Alerts for applications and incidents near here

  • 5 November 2025 Planning application submitted
  • 23 December 2025 Planning permission granted
  • 22 December 2028 Planning permission runs out

None found. The register holds no published incident that names Kilmaronock Millennium Hall Car Park - Ground Mounted Solar Array. If you know of one, report it (confidential reports are anonymised).

Has Kilmaronock Millennium Hall Car Park - Ground Mounted Solar Array had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Kilmaronock Millennium Hall Car Park - Ground Mounted Solar Array; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Kilmaronock Millennium Hall Car Park - Ground Mounted Solar Array?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 24 February 2026.
Where is Kilmaronock Millennium Hall Car Park - Ground Mounted Solar Array?
6.7 km north-east of Alexandria, Strathclyde, United Kingdom (postcode G83 8NF).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).