← Back to Strathclyde
Planning pack for this site, £295Other options

Solar · United Kingdom

Central Eco Park - Solar Farm

Operator HY2Go Limited

Awaiting Construction12 MWData checked 16 November 2026Source record dated 17 January 2022

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Central Eco Park - Solar Farm is a 12 MW solar farm 9 km south-west of Lanark, Strathclyde, United Kingdom. Its planning application (P/21/2200) went to South Lanarkshire on 26 December 2021 and was granted on 14 February 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 54 other energy sites within 10 km, 5 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Central Eco Park - Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1238, Leak from solar heating system at Carnegie Leisure Centre Dunfermline, 57 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12382019Leak from solar heating system at Carnegie Leisure Centre Dunfermline57 kmMinor
EIR-20162022Solar panel fire evacuates Hawick High School69 kmSignificant
EIR-14762026House fire reported to have started on solar panels in Carnoustie122 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
12 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
HY2Go Limited
Location
700M North Of Birkhill Mill Cairnhouses Road Douglas, Lanark, Strathclyde, ML11 0RS, United Kingdom
Planning authority
South Lanarkshire
Planning application
P/21/2200

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for P/21/2200, with what the planning evidence pack adds for this site.

Every application in South Lanarkshire · Alerts for applications and incidents near here

  • 26 December 2021 Planning application submitted
  • 14 February 2023 Planning permission granted
  • 14 February 2026 Planning permission expired

None found. The register holds no published incident that names Central Eco Park - Solar Farm. If you know of one, report it (confidential reports are anonymised).

Has Central Eco Park - Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Central Eco Park - Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Central Eco Park - Solar Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 17 January 2022.
Where is Central Eco Park - Solar Farm?
9 km south-west of Lanark, Strathclyde, United Kingdom (postcode ML11 0RS).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).