Battery storage · United Kingdom
Land At Birkhill Commercial Park Battery Storage (Coalburn Energy - Battery Storage)
Operator Alcemi Storage Development Limited · Owner Alcemi Storage Developments 4 Limited
Operational500 MWData checked 16 November 2026Source record dated 4 September 2026
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Land At Birkhill Commercial Park Battery Storage (Coalburn Energy - Battery Storage) is a 500 MW battery storage site 8.2 km south-west of Lanark, Strathclyde, United Kingdom. Its planning application (ECU00003458) went to Scottish Government (S36) on 6 April 2022 and was granted on 7 June 2023. It has been operating since 1 August 2026. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 53 other energy sites within 10 km, 14 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Land At Birkhill Commercial Park Battery Storage (Coalburn Energy - Battery Storage) changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
Outage notices at this site
6 planned or unplanned unavailability notices published under REMIT, 19 Nov 2026 to 20 Nov 2026, 1 live now. Members see each notice: planned or unplanned, the capacity out, the dates and the cause given.
Contains BMRS data © Elexon Limited copyright and database right. Read each morning; a notice can be withdrawn or revised by the operator.
What this site did, from settlement data
Full revenue and market view The pounds behind each bar, any period back to 2021, where it ranks against every site like it, who trades it, and a side-by-side with any other site.
30 settled days to 7 Nov: 14,844 MWh out and 16,763 MWh in, active 45% of half hours, peak 55 MW of 500. Members see what that output was worth at the market index price, half hour by half hour, and the rate per MW a year.
Contains BMRS data © Elexon Limited copyright and database right (datasets B1610 and MID, the interim settlement run). Read each morning; a settled figure can be revised in later runs.
The company behind this site
ALCEMI STORAGE DEVELOPMENTS 4 LIMITED (12376965), active, since 2019. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
The site
- Technology
- Battery storage (Stand-alone Storage)
- Capacity
- 500 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Alcemi Storage Development Limited
- Owner
- Alcemi Storage Developments 4 Limited
- Location
- 700m N/O Birkhill Mill, Cairnhouses Road, Lanark, Strathclyde, ML11, United Kingdom
- Planning authority
- Scottish Government (S36)
- Planning application
- ECU00003458
- First operating
- 2026
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for ECU00003458, with what the planning evidence pack adds for this site.
Every application in Scottish Government (S36) · Alerts for applications and incidents near here
Timeline
- 6 April 2022 Planning application submitted
- 7 June 2023 Planning permission granted
- 1 November 2023 Construction started
- 1 August 2026 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Land At Birkhill Commercial Park Battery Storage (Coalburn Energy - Battery Storage). If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Land At Birkhill Commercial Park Battery Storage (Coalburn Energy - Battery Storage) had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Land At Birkhill Commercial Park Battery Storage (Coalburn Energy - Battery Storage); it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Land At Birkhill Commercial Park Battery Storage (Coalburn Energy - Battery Storage)?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 4 September 2026.
- Where is Land At Birkhill Commercial Park Battery Storage (Coalburn Energy - Battery Storage)?
- 8.2 km south-west of Lanark, Strathclyde, United Kingdom (postcode ML11).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).