Onshore wind · United Kingdom
Broken Cross (Former Surface Mine)
Operator BayWa r.e. UK Limited · Owner Baywa AG
Operational48 MWData checked 16 November 2026Source record dated 16 January 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Broken Cross (Former Surface Mine) is a 48 MW wind farm 8 km south of Lanark, United Kingdom. Its planning application (P/19/1636) went to South Lanarkshire on 30 October 2019 and was granted on 21 April 2020. It has been operating since 1 October 2024. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 48 other energy sites within 10 km, 26 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Broken Cross (Former Surface Mine) changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
What this site did, from settlement data
Full revenue and market view The pounds behind each bar, any period back to 2021, where it ranks against every site like it, who trades it, and a side-by-side with any other site.
29 settled days to 5 Nov: 3,283 MWh, running 68% of half hours, peak 21 MW of 48, load factor 10%. Members see what that output was worth at the market index price, half hour by half hour, and the rate per MW a year.
A day out costs this site about £18,546 at its earnings over the last 29 settled days (wholesale at the market index price). A figure from the market, not a claim: what the site earned, averaged, is what a day out forgoes.
Contains BMRS data © Elexon Limited copyright and database right (datasets B1610 and MID, the interim settlement run). Read each morning; a settled figure can be revised in later runs.
The company behind this site
BAYWA R.E. UK LIMITED (07538870), active, since 2011. 3 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
The site
- Technology
- Onshore wind
- Capacity
- 48 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- BayWa r.e. UK Limited
- Owner
- Baywa AG
- Location
- Former Surface Mine, Tower Road, Douglas, Broken Cross, Lanark, Strathclyde, Lanarkshire, ML11 9PB, United Kingdom
- Planning authority
- South Lanarkshire
- Planning application
- P/19/1636
- First operating
- 2024
- Turbines
- 10, 149.9 m to tip
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for P/19/1636, with what the planning evidence pack adds for this site.
Every application in South Lanarkshire · Alerts for applications and incidents near here
Timeline
- 30 October 2019 Planning application submitted
- 21 April 2020 Planning permission granted
- 1 July 2023 Construction started
- 1 October 2024 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Broken Cross (Former Surface Mine). If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Broken Cross (Former Surface Mine) had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Broken Cross (Former Surface Mine); it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Broken Cross (Former Surface Mine)?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 16 January 2026.
- Where is Broken Cross (Former Surface Mine)?
- 8 km south of Lanark, United Kingdom (postcode ML11 9PB).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).