← Back to Derbyshire
Planning pack for this site, £295Other options

Solar · United Kingdom

Oaklands Solar Farm Project - Solar Farm & Battery Storage

Operator BayWa r.e. UK Limited · Owner Baywa AG

Under Construction152 MWData checked 16 November 2026Source record dated 12 October 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Oaklands Solar Farm Project - Solar Farm & Battery Storage is a 152 MW solar farm 6.4 km south-west of Swadlincote, Derbyshire, United Kingdom. Its planning application (EN010122) went to The Planning Inspectorate - National Infrastructure on 8 February 2024 and was granted on 19 June 2025. Construction started on 1 September 2026. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 48 other energy sites within 10 km, 28 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

BAYWA R.E. UK LIMITED (07538870), active, since 2011. 3 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Oaklands Solar Farm Project - Solar Farm & Battery Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 54 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells54 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool111 kmMajor
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire117 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
152 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Under Construction
Operator or applicant
BayWa r.e. UK Limited
Owner
Baywa AG
Location
W/O Rosliston & E/O Walton on Trent, Swadlincote, Derbyshire, DE12, United Kingdom
Planning authority
The Planning Inspectorate - National Infrastructure
Planning application
EN010122

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for EN010122, with what the planning evidence pack adds for this site.

Every application in The Planning Inspectorate - National Infrastructure · Alerts for applications and incidents near here

Status changed from Awaiting Construction to Under Construction on 16 November 2026.

  • 8 February 2024 Planning application submitted
  • 19 June 2025 Planning permission granted
  • 1 September 2026 Construction started

None found. The register holds no published incident that names Oaklands Solar Farm Project - Solar Farm & Battery Storage. If you know of one, report it (confidential reports are anonymised).

Has Oaklands Solar Farm Project - Solar Farm & Battery Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Oaklands Solar Farm Project - Solar Farm & Battery Storage; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Oaklands Solar Farm Project - Solar Farm & Battery Storage?
Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 16 November 2026.
Where is Oaklands Solar Farm Project - Solar Farm & Battery Storage?
6.4 km south-west of Swadlincote, Derbyshire, United Kingdom (postcode DE12).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).