← Back to Derbyshire
Planning pack for this site, £295Other options

Battery storage · United Kingdom

ALUDRA BESS LTD (Caldwell Road - Battery Storage)

Operator Infrared Capital Partners Limited · Owner Aludra BESS Ltd

Revised90 MWData checked 16 November 2026Source record dated 10 May 2024

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

ALUDRA BESS LTD (Caldwell Road - Battery Storage) is a 90 MW battery storage site 4.4 km south of Burton upon Trent, Derbyshire, United Kingdom. Its planning application (DMPA/2021/1221) went to South Derbyshire on 3 August 2021 and was granted on 3 March 2022. Its status in the Renewable Energy Planning Database (UK government) is revised. There are 51 other energy sites within 10 km, 17 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

ALUDRA BESS LTD (13042704), active, since 2020. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for ALUDRA BESS LTD (Caldwell Road - Battery Storage) sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 52 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells52 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool111 kmMajor
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire119 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
90 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Revised
Operator or applicant
Infrared Capital Partners Limited
Owner
Aludra BESS Ltd
Location
N/O The Royle Farm Business Park, Caldwell Road, Burton on Trent, Derbyshire, DE15 9TU, United Kingdom
Planning authority
South Derbyshire
Planning application
DMPA/2021/1221

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for DMPA/2021/1221, with what the planning evidence pack adds for this site.

Every application in South Derbyshire · Alerts for applications and incidents near here

  • 3 August 2021 Planning application submitted
  • 3 March 2022 Planning permission granted
  • 3 March 2025 Planning permission expired

None found. The register holds no published incident that names ALUDRA BESS LTD (Caldwell Road - Battery Storage). If you know of one, report it (confidential reports are anonymised).

Has ALUDRA BESS LTD (Caldwell Road - Battery Storage) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names ALUDRA BESS LTD (Caldwell Road - Battery Storage); it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of ALUDRA BESS LTD (Caldwell Road - Battery Storage)?
Revised, in the Renewable Energy Planning Database (UK government), where it last changed on 10 May 2024.
Where is ALUDRA BESS LTD (Caldwell Road - Battery Storage)?
4.4 km south of Burton upon Trent, Derbyshire, United Kingdom (postcode DE15 9TU).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).