← Back to Derbyshire
Planning pack for this site, £295Other options

Battery storage · United Kingdom

Barn Farm - Batter Energy Storage Facility

Operator Harmony Energy Storage

Awaiting Construction200 MWData checked 16 November 2026Source record dated 29 July 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Barn Farm - Batter Energy Storage Facility is a 200 MW battery storage site 5.4 km south-west of Burton upon Trent, Derbyshire, United Kingdom. Its planning application (DMPA/2023/1665) went to South Derbyshire on 27 December 2024 and was granted on 4 July 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 50 other energy sites within 10 km, 17 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Barn Farm - Batter Energy Storage Facility sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 54 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells54 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool109 kmMajor
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire118 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
200 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Harmony Energy Storage
Location
Barn Farm, Land South of Walton Road, Swadlincote, Derbyshire, DE12 8NB, United Kingdom
Planning authority
South Derbyshire
Planning application
DMPA/2023/1665

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for DMPA/2023/1665, with what the planning evidence pack adds for this site.

Every application in South Derbyshire · Alerts for applications and incidents near here

  • 27 December 2024 Planning application submitted
  • 4 July 2025 Planning permission granted
  • 4 July 2028 Planning permission runs out

None found. The register holds no published incident that names Barn Farm - Batter Energy Storage Facility. If you know of one, report it (confidential reports are anonymised).

Has Barn Farm - Batter Energy Storage Facility had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Barn Farm - Batter Energy Storage Facility; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Barn Farm - Batter Energy Storage Facility?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 29 July 2025.
Where is Barn Farm - Batter Energy Storage Facility?
5.4 km south-west of Burton upon Trent, Derbyshire, United Kingdom (postcode DE12 8NB).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).