Clay Tye Farm Phase 2 - Storage Facility

Operator Harmony Energy Storage · Owner Harmony Ctf 2 Limited

Operational49.5 MWData checked 16 November 2026Source record dated 27 March 2024

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Clay Tye Farm Phase 2 - Storage Facility is a 49.5 MW battery storage site on the edge of Upminster, London, United Kingdom. Its planning application (P0888.18) went to Havering on 13 June 2018 and was granted on 5 February 2020. It has been operating since 22 March 2024. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 62 other energy sites within 10 km, 19 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

The operator's 14 other sites and 765 energy sites within 40 km for Clay Tye Farm Phase 2 - Storage Facility

Members see the sites and incidents around this one, and every record behind them.

HARMONY CTF 2 LIMITED (11558612), active, since 2018. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Battery storage (Stand-alone Storage)
Capacity
49.5 MW (this record)
All phases
99 MW, the phases on the register added up
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Harmony Energy Storage
Owner
Harmony Ctf 2 Limited
Location
Clay Tye Farm, Clay Tye Road, Upminster, London, RM14 3PL, United Kingdom
Planning authority
Havering
Planning application
P0888.18
First operating
2024

This record is 49.5 MW, one part of a site built in phases. With Clay Tye Farm Phase 1 - Storage Facility (49.5 MW) the phases on the register add up to 99 MW. Clay Tye Farm Phase 1 - Storage Facility

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for P0888.18, with what the planning evidence pack adds for this site.

Every application in Havering · Alerts for applications and incidents near here

  • 13 June 2018 Planning application submitted
  • 10 September 2018 Planning permission refused
  • 5 February 2020 Planning permission granted
  • 1 July 2022 Construction started
  • 22 March 2024 Operational

None found. The register holds no published incident that names Clay Tye Farm Phase 2 - Storage Facility. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Clay Tye Farm Phase 2 - Storage Facility had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Clay Tye Farm Phase 2 - Storage Facility; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Clay Tye Farm Phase 2 - Storage Facility?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 27 March 2024.
Where is Clay Tye Farm Phase 2 - Storage Facility?
On the edge of Upminster, London, United Kingdom (postcode RM14 3PL).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).