← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Battery storage · Havering

Clay Tye Farm Phase 2 - Storage Facility

Operational49.5 MWApplication P0888.18Submitted 13 June 2018Granted 5 February 2020

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
P0888.18
Planning authority
Havering
County or area
London
Nation
England
Technology
Battery storage (Stand-alone Storage)
Capacity
49.5 MW
Status
Operational
Operator or applicant
Harmony Energy Storage
Location
Clay Tye Farm, Clay Tye Road, Upminster, RM14 3PL
First operating
2024
  • 13 June 2018 Planning application submitted
  • 10 September 2018 Planning permission refused
  • 5 February 2020 Planning permission granted
  • 1 July 2022 Construction started
  • 22 March 2024 Operational

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0109, Fire in single battery unit at Thurrock BESS under construction, 11 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-01092025Fire in single battery unit at Thurrock BESS under construction11 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire155 kmSignificant
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth, caused by a short circuit in NMC cells199 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near RM14 3PL is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Havering.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.