Battery storage · United Kingdom
Clay Tye Farm - Energy Storage Facility
Operator London & Essex Energy Limited
Application Submitted200 MWData checked 16 November 2026Source record dated 10 July 2026
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Clay Tye Farm - Energy Storage Facility is a 200 MW battery storage site on the edge of Upminster, Essex, United Kingdom. Its planning application (P0634.26) went to Havering on 21 May 2026. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There are 62 other energy sites within 10 km, 19 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Clay Tye Farm - Energy Storage Facility changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Clay Tye Farm - Energy Storage Facility sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0109, Fire in single battery unit at Thurrock BESS under construction, 11 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0109 | 2025 | Fire in single battery unit at Thurrock BESS under construction | 11 km | Significant |
| EIR-0058 | 2025 | Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire | 155 km | Significant |
| EIR-0584 | 2026 | Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells | 199 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Battery storage (Stand-alone Storage)
- Capacity
- 200 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Submitted (Planning Application Submitted)
- Operator or applicant
- London & Essex Energy Limited
- Location
- Clay Tye Farm, Upminster, Essex, RM14 3PL, United Kingdom
- Planning authority
- Havering
- Planning application
- P0634.26
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for P0634.26, with what the planning evidence pack adds for this site.
Every application in Havering · Alerts for applications and incidents near here
Timeline
- 21 May 2026 Planning application submitted
Incidents on the register at this site
None found. The register holds no published incident that names Clay Tye Farm - Energy Storage Facility. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Clay Tye Farm - Energy Storage Facility had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Clay Tye Farm - Energy Storage Facility; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Clay Tye Farm - Energy Storage Facility?
- Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 10 July 2026.
- Where is Clay Tye Farm - Energy Storage Facility?
- On the edge of Upminster, Essex, United Kingdom (postcode RM14 3PL).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).