Clay Tye Farm Phase 1 - Storage Facility
Operator Harmony Energy Storage · Owner Harmony Ctf Limited
Operational49.5 MWData checked 16 November 2026Source record dated 27 March 2024
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Clay Tye Farm Phase 1 - Storage Facility is a 49.5 MW battery storage site on the edge of Upminster, London, United Kingdom. Its planning application (P0611.17) went to Havering on 28 April 2017 and was granted on 6 March 2023. It has been operating since 22 March 2024. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 62 other energy sites within 10 km, 19 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Clay Tye Farm Phase 1 - Storage Facility changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The company behind this site
HARMONY CTF LIMITED (10683553), active, since 2017. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
The site
- Technology
- Battery storage (Stand-alone Storage)
- Capacity
- 49.5 MW (this record)
- All phases
- 99 MW, the phases on the register added up
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Harmony Energy Storage
- Owner
- Harmony Ctf Limited
- Location
- Clay Tye Farm, Clay Tye Road, Upminster, London, RM14 3PL, United Kingdom
- Planning authority
- Havering
- Planning application
- P0611.17
- First operating
- 2024
This record is 49.5 MW, one part of a site built in phases. With Clay Tye Farm Phase 2 - Storage Facility (49.5 MW) the phases on the register add up to 99 MW. Clay Tye Farm Phase 2 - Storage Facility
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for P0611.17, with what the planning evidence pack adds for this site.
Every application in Havering · Alerts for applications and incidents near here
Timeline
- 28 April 2017 Planning application submitted
- 18 July 2017 Planning permission refused
- 1 July 2022 Construction started
- 6 March 2023 Planning permission granted
- 22 March 2024 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Clay Tye Farm Phase 1 - Storage Facility. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Clay Tye Farm Phase 1 - Storage Facility had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Clay Tye Farm Phase 1 - Storage Facility; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Clay Tye Farm Phase 1 - Storage Facility?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 27 March 2024.
- Where is Clay Tye Farm Phase 1 - Storage Facility?
- On the edge of Upminster, London, United Kingdom (postcode RM14 3PL).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).