Planning pack for this site, £295Other options

Onshore wind · United Kingdom

Druim Leathann Windfarm

Operator Baywa R.E. UK Limited · Owner Baywa AG

Awaiting Construction48.3 MWData checked 16 November 2026Source record dated 31 October 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Druim Leathann Windfarm is a 48.3 MW wind farm 12 km north-east of Isle of Lewis, Western Isles, United Kingdom. Its planning application (18/00216/PPDM) went to Na h-Eileanan Siar on 8 June 2018 and was granted on 22 June 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 2 other energy sites within 10 km. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

BAYWA R.E. UK LIMITED (07538870), active, since 2011. 3 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Druim Leathann Windfarm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0767, Nordex turbine fire prompts investigation at Scottish wind farm, 213 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-07672024Nordex turbine fire prompts investigation at Scottish wind farm213 kmSignificant
EIR-00632024Fatal fall from turbine nacelle during onshore wind maintenance, UK213 kmMajor
EIR-00322017Fatal fall during onshore wind turbine construction, inquiry findings on rescue arrangements and equipment213 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Capacity
48.3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Baywa R.E. UK Limited
Owner
Baywa AG
Location
Druim Leathann Windfarm, North Tolsta, Isle Of Lewis, Western Isles, HS2 0N, United Kingdom
Planning authority
Na h-Eileanan Siar
Planning application
18/00216/PPDM
Turbines
14, 140 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 18/00216/PPDM, with what the planning evidence pack adds for this site.

Every application in Na h-Eileanan Siar · Alerts for applications and incidents near here

  • 8 June 2018 Planning application submitted
  • 22 June 2022 Planning permission granted
  • 27 June 2025 Planning permission expired

None found. The register holds no published incident that names Druim Leathann Windfarm. If you know of one, report it (confidential reports are anonymised).

Has Druim Leathann Windfarm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Druim Leathann Windfarm; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Druim Leathann Windfarm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 31 October 2025.
Where is Druim Leathann Windfarm?
12 km north-east of Isle of Lewis, Western Isles, United Kingdom (postcode HS2 0N).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).