Planning pack for this site, £295Other options

Onshore wind · United Kingdom

Stornoway Wind Farm (second resubmission)

Operator EDF Renewables UK & ESB

Awaiting Construction196 MWData checked 16 November 2026Source record dated 21 March 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Stornoway Wind Farm (second resubmission) is a 196 MW wind farm in Isle of Lewis, Western Isles, United Kingdom. Its planning application (ECU00001850) went to Scottish Government (S36) on 22 May 2019 and was granted on 5 January 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 6 other energy sites within 10 km, 5 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Stornoway Wind Farm (second resubmission) sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0767, Nordex turbine fire prompts investigation at Scottish wind farm, 209 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-07672024Nordex turbine fire prompts investigation at Scottish wind farm209 kmSignificant
EIR-00632024Fatal fall from turbine nacelle during onshore wind maintenance, UK209 kmMajor
EIR-00322017Fatal fall during onshore wind turbine construction, inquiry findings on rescue arrangements and equipment209 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Capacity
196 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
EDF Renewables UK & ESB
Location
North Lewis, Isle of Lewis, Western Isles, United Kingdom
Planning authority
Scottish Government (S36)
Planning application
ECU00001850
Turbines
33, 180 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for ECU00001850, with what the planning evidence pack adds for this site.

Every application in Scottish Government (S36) · Alerts for applications and incidents near here

  • 22 May 2019 Planning application submitted
  • 5 January 2022 Planning permission granted
  • 5 January 2025 Planning permission expired

None found. The register holds no published incident that names Stornoway Wind Farm (second resubmission). If you know of one, report it (confidential reports are anonymised).

Has Stornoway Wind Farm (second resubmission) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Stornoway Wind Farm (second resubmission); it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Stornoway Wind Farm (second resubmission)?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 21 March 2024.
Where is Stornoway Wind Farm (second resubmission)?
In Isle of Lewis, Western Isles, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).