Siemens Gamesa blade damaged during installation at Orsted Hornsea 3
2026Published 20 Nov 2026Responsible editor: Chief Editor
A day out at Hornsea 3 costs about £487,401, at the site's own earnings over its last 28 settled days (wholesale at the market index price). A week out is about £3,411,807. A figure from the market, not a claim: what the site earned, averaged, is what each day out forgoes.
Get the next one by email
Free alerts on wind (offshore) incidents in the United Kingdom, and an email when EIR-2973 is updated. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Companies named in the reporting of this entry (being named is not a finding of fault): Orsted, Siemens Gamesa
What happened
Recharge News reported on 20 November 2026 that a Siemens Gamesa blade was damaged during wind turbine installation at Orsted's Hornsea 3 project in the UK North Sea. The turbine model being installed is the Siemens Gamesa SG 14-236 DD. The report states that the damage happened during installation. The source does not give the date of the damage, the extent of the blade damage, the cause, whether any person was hurt, or whether installation work was halted.
The article text available to the register is short and contains no further detail. The account rests on a single news report and has not been confirmed by the developer, the turbine supplier or a regulator.
Lessons learned
- Lift and handling plans for turbine blades during offshore installation should be checked against weather, sea state and vessel motion limits before each lift.
- Operators should record blade handling events promptly, including the stage of the lift or installation at which damage occurred, to support root-cause analysis.
- Developers, installers and turbine suppliers should share installation damage findings across projects so that handling procedures can be improved.
More lessons on weather and external hazards, structural integrity and turbines, worker safety and safe systems of work, from every incident on the register.
Site page: Hornsea 3 (status, dates and other incidents)
Other entries that name Gamesa
Other entries that name Orsted
Published 2026-11-20. Written from public reporting. Descriptive, not investigative. See the data accuracy disclaimer.