Outer Dowsing Offshore Wind Farm

Operator Green Investment Group & Total Energies

Awaiting Construction1,500 MWData checked 16 November 2026Source record dated 3 March 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Outer Dowsing Offshore Wind Farm is a 1,500 MW offshore wind farm 57 km north-east of Cromer, United Kingdom. Its planning application (EN010130) went to The Planning Inspectorate - National Infrastructure on 19 March 2024 and was granted on 10 February 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. No other energy site in the register's datasets is within 10 km. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Outer Dowsing Offshore Wind Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 14 comparable offshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0447, Fire destroyed turbine at Scroby Sands Offshore Wind Farm in 2023, 89 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-04472023Fire destroyed turbine at Scroby Sands Offshore Wind Farm in 202389 kmMajor
EIR-00292024Second blade failure of 2024 at Dogger Bank A offshore wind farm263 kmSignificant
EIR-07582024Service vessel collision damages turbine at Orsted's Hornsea Project One offshore wind farm263 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 11 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Offshore wind
Capacity
1,500 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Green Investment Group & Total Energies
Location
Outer Dowsing Offshore Wind Farm, Lincoln, Offshore, LN1, United Kingdom
Planning authority
The Planning Inspectorate - National Infrastructure
Planning application
EN010130
Turbines
100, 403 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for EN010130, with what the planning evidence pack adds for this site.

Every application in The Planning Inspectorate - National Infrastructure · Alerts for applications and incidents near here

  • 19 March 2024 Planning application submitted
  • 10 February 2026 Planning permission granted
  • 10 February 2031 Planning permission runs out

None found. The register holds no published incident that names Outer Dowsing Offshore Wind Farm. If you know of one, report it (confidential reports are anonymised).

Has Outer Dowsing Offshore Wind Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Outer Dowsing Offshore Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Outer Dowsing Offshore Wind Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 3 March 2026.
Where is Outer Dowsing Offshore Wind Farm?
57 km north-east of Cromer, United Kingdom (postcode LN1).