Offshore wind · United Kingdom
Hornsea 4
Operator Orsted (formerly Dong Energy)
Awaiting Construction2,400 MWData checked 16 November 2026Source record dated 7 May 2025
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Hornsea 4 is a 2,400 MW offshore wind farm, United Kingdom. Its planning application (EN010098) went to The Planning Inspectorate - National Infrastructure on 29 September 2021 and was granted on 12 July 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 2 other energy sites within 10 km. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Hornsea 4 changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, offshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Hornsea 4 sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 14 comparable offshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0447, Fire destroyed turbine at Scroby Sands Offshore Wind Farm in 2023, 121 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0447 | 2023 | Fire destroyed turbine at Scroby Sands Offshore Wind Farm in 2023 | 121 km | Major |
| EIR-0029 | 2024 | Second blade failure of 2024 at Dogger Bank A offshore wind farm | 233 km | Significant |
| EIR-0758 | 2024 | Service vessel collision damages turbine at Orsted's Hornsea Project One offshore wind farm | 233 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 11 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Offshore wind
- Capacity
- 2,400 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Orsted (formerly Dong Energy)
- Location
- 69km offshore from Flamborough, Offshore, United Kingdom
- Planning authority
- The Planning Inspectorate - National Infrastructure
- Planning application
- EN010098
- Turbines
- 180
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for EN010098, with what the planning evidence pack adds for this site.
Every application in The Planning Inspectorate - National Infrastructure · Alerts for applications and incidents near here
Timeline
- 29 September 2021 Planning application submitted
- 12 July 2023 Planning permission granted
- 12 July 2030 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names Hornsea 4. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Hornsea 4 had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Hornsea 4; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Hornsea 4?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 7 May 2025.
- Where is Hornsea 4?
- 69km offshore from Flamborough, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.