Offshore wind · United Kingdom

Westermost Rough A

Operator Orsted (formerly Dong Energy)

Operational210 MWData checked 16 November 2026Source record dated 5 April 2018

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Westermost Rough A is a 210 MW offshore wind farm 16 km east of Skegness, United Kingdom. Its planning application went to DECC (S36) on 17 November 2009 and was granted on 29 November 2011. It has been operating since 26 May 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 4 other energy sites within 10 km. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 13 other sites and 78 energy sites within 40 km for Westermost Rough A

Members see the sites and incidents around this one, and every record behind them.

7 Oct4 Nov
Wholesale

Full revenue and market view The pounds behind each bar, any period back to 2021, where it ranks against every site like it, who trades it, and a side-by-side with any other site.

29 settled days to 4 Nov: 45,897 MWh, running 94% of half hours, peak 103 MW of 210, load factor 31%. Members see what that output was worth at the market index price, half hour by half hour, and the rate per MW a year.

A day out costs this site about £229,781 at its earnings over the last 29 settled days (wholesale at the market index price). A figure from the market, not a claim: what the site earned, averaged, is what a day out forgoes.

Contains BMRS data © Elexon Limited copyright and database right (datasets B1610 and MID, the interim settlement run). Read each morning; a settled figure can be revised in later runs.

Technology
Offshore wind
Capacity
210 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Orsted (formerly Dong Energy)
Location
25 km north of Spurn Head at the River Humber estuary., Offshore, United Kingdom
Planning authority
DECC (S36)
First operating
2015
Turbines
35

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page, with what the planning evidence pack adds for this site.

Every application in DECC (S36) · Alerts for applications and incidents near here

  • 17 November 2009 Planning application submitted
  • 29 November 2011 Planning permission granted
  • 28 February 2014 Construction started
  • 26 May 2015 Operational

None found. The register holds no published incident that names Westermost Rough A. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Westermost Rough A had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Westermost Rough A; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Westermost Rough A?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 5 April 2018.
Where is Westermost Rough A?
16 km east of Skegness, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).