DECC (S36): energy planning applications
36 battery, solar and wind applications in the government planning database for DECC (S36), 9.1 GW in all. 1 still in planning.
Onshore wind 1 · Offshore wind 35 · Wind across the UK
Alerts for applications near you
An email when an application near your postcode in DECC (S36) or beyond is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.
By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.
Every application in DECC (S36), newest first
- Thanet (extension)
- Walney 3
- Atlantic Array One - Bristol Channel Zone
- Westermost Rough A
- Dudgeon East
- Race Bank (Phase 1)
- Race Bank (Phase 2)
- Llanbrynmair Wind Farm
- Docking Shoal A
- Humber Gateway A
- Gunfleet Sands II
- Centrica (Lincs)
- Sheringham Shoal
- West of Duddon Sands
- Walney 1
- Walney 2
- Thanet
- Gwynt y Mor
- Greater Gabbard Wind Farm
- Ormonde Offshore
- London Array Phase 1
- Teeside Offshore Wind Farm
- Lynn
- Inner Dowsing
- Kentish Flats
- Barrow
- Burbo Bank
- Rhyl Flats
- Gunfleet Sands Offshore Wind Scheme
- North Hoyle
- Scroby Sands
- Blyth Offshore
- Cirrus Shell Flat Array
- Cromer
- Gunfleet Sands - (Demo) Extension
- Scarweather Sands
Latest decisions
Refused, withdrawn or taken to appeal
Incidents on the register near DECC (S36)'s applications
25 incidents within 50 km of an application here, nearest first. Counts of incidents in published reporting, not rates.
- Fire destroyed turbine at Scroby Sands Offshore Wind Farm in 2023
- Solar panels linked to fires at council buildings in Northumberland
- Substation fire in Blackpool cuts power to thousands of customers
- Solar panel fire spreads through roof of new flats at Ebbsfleet
- Explosion and prolonged fire at Orsted battery storage site in Liverpool
- Wind turbine fire at Butterwick Wind Farm near Sedgefield
- Service vessel collision damages turbine at Orsted's Hornsea Project One offshore wind farm
- Engineer loses arm during repair at North Sea Siemens Gamesa turbine
- Flooding reaches electrical substation in Colchester
- Wind turbine blade detaches at Conisholme wind farm in Lincolnshire after bolt failure
For a planning case
The planning evidence pack sets out, for one application in DECC (S36), every comparable incident nearest first with its sources, the schemes refused, withdrawn or taken to appeal nearby, and the fire service guidance each incident bears on. Launch price: £145 until 31 October (normally £295). Download a sample pack (PDF).
Neighbouring planning authorities
Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Every planning authority.