Planning application · Offshore wind · DECC (S36)
Walney 1
Operational184 MWSubmitted 31 March 2006Granted 7 November 2007
The application
- Planning authority
- DECC (S36)
- County or area
- Offshore
- Nation
- England
- Technology
- Offshore wind
- Capacity
- 184 MW
- Status
- Operational
- Operator or applicant
- Orsted (formerly Dong Energy)
- Location
- 14km off Walney Island, Irish Sea
- Turbines
- 51
- First operating
- 2011
Timeline
- 31 March 2006 Planning application submitted
- 7 November 2007 Planning permission granted
- 10 March 2010 Construction started
- 30 May 2011 Operational
Preview of the planning evidence pack for this site
The pack for this site lists 11 comparable offshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0758, Service vessel collision damages turbine at Orsted's Hornsea Project One offshore wind farm, 165 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0758 | 2024 | Service vessel collision damages turbine at Orsted's Hornsea Project One offshore wind farm | 165 km | Significant |
| EIR-1778 | 2018 | Engineer loses arm during repair at North Sea Siemens Gamesa turbine | 165 km | Major |
| EIR-0447 | 2023 | Fire destroyed turbine at Scroby Sands Offshore Wind Farm in 2023 | 383 km | Major |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 8 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packWhat the planning evidence pack adds for this application
The pack is made for Walney 1 from the register and the government planning database: every comparable incident, nearest first, with its sources; the schemes refused, withdrawn or taken to appeal within 40 km, your council first; and the fire service guidance each incident bears on. One fixed, dated file, as a PDF, a web page and a Word document.
- Incidents within 50 km
- •••
- Nearest recorded incident
- ••••••
- UK grid-scale incidents, with NFCC notes
- ••••
- Schemes refused within 40 km
- •••
- Nearest refused scheme
- ••••••••••••
- Appeals within 40 km
- •••
- Decisions in DECC (S36)
- ••••••••
- Sites of a similar size, worldwide
- ••••
- NFCC guidance points
- ••••••••
- Sources and citations
- ••••••••••
Launch price: £145 until 31 October (normally £295). By email in minutes. The order form arrives filled in from this application.
Alerts for applications near here
An email when another battery, solar or wind application near Walney 1 is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.
By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.
Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.
The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in DECC (S36).
Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.