← Back to Offshore

Offshore wind · United Kingdom

Ormonde Offshore

Operator Vattenfall

Operational150 MWData checked 16 November 2026Source record dated 23 August 2017

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Ormonde Offshore is a 150 MW offshore wind farm 14 km west of Barrow in Furness, United Kingdom. Its planning application went to DECC (S36) on 12 July 2005 and was granted on 4 September 2008. It has been operating since 22 February 2012. Its status in the Renewable Energy Planning Database (UK government) is operational. There is one other energy site within 10 km. The register holds one incident at this site, the latest in 2021.

Matched by the site's name in the entry's own reporting. If one is wrong, tell the editor.

The cause, the 1 linked record and the operator's 27 other sites for Ormonde Offshore

Members see the sites and incidents around this one, and every record behind them.

7 Oct5 Nov
WholesaleBalancing mechanism

Full revenue and market view The pounds behind each bar, any period back to 2021, where it ranks against every site like it, who trades it, and a side-by-side with any other site.

30 settled days to 5 Nov: 20,906 MWh, running 87% of half hours, peak 68 MW of 150, load factor 20%. Members see what that output was worth at the market index price, half hour by half hour, and the rate per MW a year.

A day out costs this site about £98,250 at its earnings over the last 30 settled days (wholesale at the market index price). A figure from the market, not a claim: what the site earned, averaged, is what a day out forgoes.

Contains BMRS data © Elexon Limited copyright and database right (datasets B1610 and MID, the interim settlement run). Read each morning; a settled figure can be revised in later runs.

Technology
Offshore wind
Capacity
150 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Vattenfall
Location
10km off Barrow on Furness, Heysham, Offshore, United Kingdom
Planning authority
DECC (S36)
First operating
2012
Turbines
30

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page, with what the planning evidence pack adds for this site.

Every application in DECC (S36) · Alerts for applications and incidents near here

  • 12 July 2005 Planning application submitted
  • 4 September 2008 Planning permission granted
  • 1 June 2010 Construction started
  • 22 February 2012 Operational

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Ormonde Offshore had a fire or other incident?
Yes. The register holds one incident that names it: Turbine components fall into sea at Ormonde offshore wind farm, Irish Sea (EIR-0900, 2021).
What is the status of Ormonde Offshore?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 23 August 2017.
Where is Ormonde Offshore?
14 km west of Barrow in Furness, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).