Onshore wind · United Kingdom
Aultmore Forest - Buckie - Windfarm
Operator Vattenfall
Application Submitted106 MWData checked 16 November 2026Source record dated 8 March 2024
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Aultmore Forest - Buckie - Windfarm is a 106 MW wind farm 17 km south of Buckie, Grampian, United Kingdom. Its planning application (ECU00003365) went to Scottish Government (S36) on 28 February 2024. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There are 21 other energy sites within 10 km, 8 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Aultmore Forest - Buckie - Windfarm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Aultmore Forest - Buckie - Windfarm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1386, Wind turbine fire near St Cyrus in Aberdeenshire, 89 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1386 | 2022 | Wind turbine fire near St Cyrus in Aberdeenshire | 89 km | Minor |
| EIR-0767 | 2024 | Nordex turbine fire prompts investigation at Scottish wind farm | 108 km | Significant |
| EIR-0063 | 2024 | Fatal fall from turbine nacelle during onshore wind maintenance, UK | 108 km | Major |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Onshore wind
- Capacity
- 106 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Submitted (Planning Application Submitted)
- Operator or applicant
- Vattenfall
- Location
- Aultmore Forest, Drybridge, Buckie, Grampian, AB55, United Kingdom
- Planning authority
- Scottish Government (S36)
- Planning application
- ECU00003365
- Turbines
- 16, 200 m to tip
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for ECU00003365, with what the planning evidence pack adds for this site.
Every application in Scottish Government (S36) · Alerts for applications and incidents near here
Timeline
- 28 February 2024 Planning application submitted
Incidents on the register at this site
None found. The register holds no published incident that names Aultmore Forest - Buckie - Windfarm. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Aultmore Forest - Buckie - Windfarm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Aultmore Forest - Buckie - Windfarm; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Aultmore Forest - Buckie - Windfarm?
- Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 8 March 2024.
- Where is Aultmore Forest - Buckie - Windfarm?
- 17 km south of Buckie, Grampian, United Kingdom (postcode AB55).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).