Register / Solar PV / EIR-2069
← Back to the list
Solar PVUnited KingdomEIR-2069

Solar panel fire spreads through roof of new flats at Ebbsfleet

Feb 2021Published 6 Oct 2026Responsible editor: Chief Editor

Estimated damageEstimated by the register's adjusterHow? Know the real figure?
Figure hidden: shown to subscribersMedium confidence
out of service for about •• daysShown in the record →Full estimate
From the recordRoot cause hiddenFailed part hidden

Companies named in the reporting of this entry (being named is not a finding of fault): Redrow

On the morning of 23 February 2021 a fire broke out in the roof of a block of 15 unoccupied new flats at Redrow's Ebbsfleet Garden Village development in Ebbsfleet, Kent, England. The building was still under construction and workers were inside when smoke was seen. Kent Fire and Rescue Service sent six fire engines and a bulk water carrier at around 11am. Crews wore breathing apparatus and the fire spread through the roof space before it was brought fully under control.

The incident lasted around five hours and crews finished at about 4pm. An adjacent block of flats was evacuated as a precaution, and its residents were later allowed to return. One Redrow employee was taken to hospital as a precaution. Kent Fire and Rescue Service said a fire investigation found the fire started accidentally when a solar panel caught alight and spread to the roof.

The fire service found that a solar panel caught alight accidentally and the fire spread to the roof of the building. The building was under construction at the time. The specific fault in the panel or its wiring was not reported.

  1. Treat rooftop PV on buildings under construction as live equipment from the moment panels are exposed to daylight, and control who works near it.
  2. Commission and test rooftop systems, including connectors and cable routes, before the roof space is closed up, and record the results.
  3. Assess how a fire starting at the array could spread into the roof space and specify fire separation and roof covering accordingly.
  4. Make sure site fire plans for construction projects cover PV arrays, including isolation and firefighter access.

More lessons on electrical protection and isolation, spacing, layout and fire spread, fire suppression and firefighting, from every incident on the register.

Published 2026-10-06. Written from public reporting. Descriptive, not investigative. See the data accuracy disclaimer.

See the register's stories first in Google: add it as a preferred source.

Chart to reuse with this story: Solar PV incidents in the United Kingdom, by year, free with a credit (PNG).

Solar PV incidents in the United Kingdom: 99 entries, with a free alert for the next one.

Solar farm fires: the counts, the latest entries and a free alert for the next one. Also: rooftop solar fires.

Browse the full register or submit an incident.