Battery storage · United Kingdom

Richborough Energy Park - Phase 3 (Sheaf)

Operator Pacific Green

Under Construction249 MWData checked 16 November 2026Source record dated 11 November 2024

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Richborough Energy Park - Phase 3 (Sheaf) is a 249 MW battery storage site 5.6 km south-west of Ramsgate, Kent, United Kingdom. Its planning application (F/TH/22/0579) went to Thanet on 25 April 2022 and was granted on 22 September 2022. Construction started on 1 October 2024. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 47 other energy sites within 10 km, 10 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

18 Oct3 Nov
Wholesale

Full revenue and market view The pounds behind each bar, any period back to 2021, where it ranks against every site like it, who trades it, and a side-by-side with any other site.

29 settled days to 4 Nov: 158 MWh out and 129 MWh in, active 1% of half hours, peak 25 MW of 249. Members see what that output was worth at the market index price, half hour by half hour, and the rate per MW a year.

A day out costs this site about £54 at its earnings over the last 29 settled days (wholesale at the market index price). A figure from the market, not a claim: what the site earned, averaged, is what a day out forgoes.

Contains BMRS data © Elexon Limited copyright and database right (datasets B1610 and MID, the interim settlement run). Read each morning; a settled figure can be revised in later runs.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Richborough Energy Park - Phase 3 (Sheaf) sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0109, Fire in single battery unit at Thurrock BESS under construction, 67 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-01092025Fire in single battery unit at Thurrock BESS under construction67 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire231 kmSignificant
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells262 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
249 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Under Construction
Operator or applicant
Pacific Green
Location
Richborough Energy Park, Sandwich Road, Ramsgate, Sandwich, Kent, CT13 9NL, United Kingdom
Planning authority
Thanet
Planning application
F/TH/22/0579

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for F/TH/22/0579, with what the planning evidence pack adds for this site.

Every application in Thanet · Alerts for applications and incidents near here

  • 25 April 2022 Planning application submitted
  • 22 September 2022 Planning permission granted
  • 1 October 2024 Construction started

None found. The register holds no published incident that names Richborough Energy Park - Phase 3 (Sheaf). If you know of one, report it (confidential reports are anonymised).

Has Richborough Energy Park - Phase 3 (Sheaf) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Richborough Energy Park - Phase 3 (Sheaf); it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Richborough Energy Park - Phase 3 (Sheaf)?
Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 11 November 2024.
Where is Richborough Energy Park - Phase 3 (Sheaf)?
5.6 km south-west of Ramsgate, Kent, United Kingdom (postcode CT13 9NL).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).