Offshore wind · United Kingdom
Hornsea 2 - Optimus and Breesea
Operator Orsted (formerly Dong Energy)
Operational1,320 MWData checked 16 November 2026Source record dated 1 September 2022
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Hornsea 2 - Optimus and Breesea is a 1,320 MW offshore wind farm, United Kingdom. Its planning application (EN010053) went to The Planning Inspectorate - National Infrastructure on 30 January 2015 and was granted on 16 August 2016. It has been operating since 31 August 2022. Its status in the Renewable Energy Planning Database (UK government) is operational. No other energy site in the register's datasets is within 10 km. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Hornsea 2 - Optimus and Breesea changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, offshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Offshore wind
- Capacity
- 1,320 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Orsted (formerly Dong Energy)
- Location
- The Wash, Sutton Bridge, Offshore, United Kingdom
- Planning authority
- The Planning Inspectorate - National Infrastructure
- Planning application
- EN010053
- First operating
- 2022
- Turbines
- 165
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for EN010053, with what the planning evidence pack adds for this site.
Every application in The Planning Inspectorate - National Infrastructure · Alerts for applications and incidents near here
Timeline
- 30 January 2015 Planning application submitted
- 16 August 2016 Planning permission granted
- 1 September 2019 Construction started
- 31 August 2022 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Hornsea 2 - Optimus and Breesea. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Hornsea 2 - Optimus and Breesea had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Hornsea 2 - Optimus and Breesea; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Hornsea 2 - Optimus and Breesea?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 1 September 2022.
- Where is Hornsea 2 - Optimus and Breesea?
- The Wash, Sutton Bridge, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.