Offshore wind · United Kingdom

Burbo Bank Extension (Burbo Bank 2)

Operational258 MWChecked 6 October 2026Last changed in the dataset 2 May 2018

Technology
Offshore wind
Capacity
258 MW
Status
Operational
Operator or applicant
Orsted (formerly Dong Energy)
Location
Burbo Flats, Liverpool Bay, approximately 6.4km (4.0 miles) from the Sefton coastline and 7.2km (4.5 miles) from North Wirral., Offshore, United Kingdom
Planning authority
The Planning Inspectorate - National Infrastructure
Planning application
EN010026
First operating
2017
Turbines
32

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

  • 22 March 2013 Planning application submitted
  • 10 December 2014 Planning permission granted
  • 10 June 2016 Construction started
  • 27 April 2017 Operational

None found. The register holds no published incident that names Burbo Bank Extension (Burbo Bank 2). If you know of one, report it (confidential reports are anonymised).

The register holds 54 incidents at offshore wind farms in the United Kingdom, 22 of them fires, and 297 worldwide. Counts of incidents in published reporting, not rates.

What fails at offshore wind farms

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.