Burbo Bank Extension (Burbo Bank 2) is a 258 MW offshore wind farm 12 km north-west of Hoylake, United Kingdom. Its planning application (EN010026) went to The Planning Inspectorate - National Infrastructure on 22 March 2013 and was granted on 10 December 2014. It has been operating since 27 April 2017. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 2 other energy sites within 10 km, one of them a offshore wind farm. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 13 other sites and 307 energy sites within 40 km for Burbo Bank Extension (Burbo Bank 2)

Members see the sites and incidents around this one, and every record behind them.

Technology
Offshore wind
Capacity
258 MW (this record)
All phases
348 MW, the phases on the register added up
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Orsted (formerly Dong Energy)
Location
Burbo Flats, Liverpool Bay, approximately 6.4km (4.0 miles) from the Sefton coastline and 7.2km (4.5 miles) from North Wirral., Offshore, United Kingdom
Planning authority
The Planning Inspectorate - National Infrastructure
Planning application
EN010026
First operating
2017
Turbines
32

This record is 258 MW, one part of a site built in phases. With Burbo Bank (90 MW) the phases on the register add up to 348 MW. Burbo Bank

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for EN010026, with what the planning evidence pack adds for this site.

Every application in The Planning Inspectorate - National Infrastructure · Alerts for applications and incidents near here

  • 22 March 2013 Planning application submitted
  • 10 December 2014 Planning permission granted
  • 10 June 2016 Construction started
  • 27 April 2017 Operational

None found. The register holds no published incident that names Burbo Bank Extension (Burbo Bank 2). If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Burbo Bank Extension (Burbo Bank 2) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Burbo Bank Extension (Burbo Bank 2); it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Burbo Bank Extension (Burbo Bank 2)?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 2 May 2018.
Where is Burbo Bank Extension (Burbo Bank 2)?
12 km north-west of Hoylake, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).