Offshore wind · United Kingdom

Hornsea 3

Operator Orsted (formerly Dong Energy)

Under Construction2,955 MWData checked 16 November 2026Source record dated 8 June 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Hornsea 3 is a 2,955 MW offshore wind farm, United Kingdom. Its planning application (EN010080) went to The Planning Inspectorate - National Infrastructure on 14 May 2018 and was granted on 30 December 2020. Construction started on 1 April 2025. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 2 other energy sites within 10 km. The register holds one incident at this site, the latest in 2026.

Matched by the site's name in the entry's own reporting. If one is wrong, tell the editor.

7 Oct4 Nov
Wholesale

Full revenue and market view The pounds behind each bar, any period back to 2021, where it ranks against every site like it, who trades it, and a side-by-side with any other site.

28 settled days to 4 Nov: 90,506 MWh, running 94% of half hours, peak 200 MW of 2,955, load factor 5%. Members see what that output was worth at the market index price, half hour by half hour, and the rate per MW a year.

A day out costs this site about £487,401 at its earnings over the last 28 settled days (wholesale at the market index price). A figure from the market, not a claim: what the site earned, averaged, is what a day out forgoes.

Contains BMRS data © Elexon Limited copyright and database right (datasets B1610 and MID, the interim settlement run). Read each morning; a settled figure can be revised in later runs.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Hornsea 3 sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 14 comparable offshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0447, Fire destroyed turbine at Scroby Sands Offshore Wind Farm in 2023, 121 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-04472023Fire destroyed turbine at Scroby Sands Offshore Wind Farm in 2023121 kmMajor
EIR-00292024Second blade failure of 2024 at Dogger Bank A offshore wind farm233 kmSignificant
EIR-07582024Service vessel collision damages turbine at Orsted's Hornsea Project One offshore wind farm233 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 11 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Offshore wind
Capacity
2,955 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Under Construction
Operator or applicant
Orsted (formerly Dong Energy)
Location
120km Offshore from Cromer, Offshore, United Kingdom
Planning authority
The Planning Inspectorate - National Infrastructure
Planning application
EN010080
Turbines
197

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for EN010080, with what the planning evidence pack adds for this site.

Every application in The Planning Inspectorate - National Infrastructure · Alerts for applications and incidents near here

  • 14 May 2018 Planning application submitted
  • 30 December 2020 Planning permission granted
  • 1 April 2025 Construction started
Has Hornsea 3 had a fire or other incident?
Yes. The register holds one incident that names it: Siemens Gamesa blade damaged during installation at Orsted Hornsea 3 (EIR-2973, 2026).
What is the status of Hornsea 3?
Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 8 June 2026.
Where is Hornsea 3?
120km Offshore from Cromer, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.