Turbine rotor and blades detach and fall into sea at Anholt wind farm
Apr 2022Published 15 Sept 2026Responsible editor: Chief Editor
- Where
- Anholt offshore wind farm off Denmark
- Operator
- Orsted
- What
- Rotor and three blades separated from nacelle and fell into sea
- Cause
- Not reported
- Outcome
- Failure concluded isolated event; restrictions lifted
Get the next one by email
Free alerts on wind (offshore) incidents in Denmark, and an email when EIR-0792 is updated. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Companies named in the reporting of this entry (being named is not a finding of fault): Orsted, Siemens Gamesa
What happened
The rotor and all three blades separated from the nacelle of a Siemens Gamesa 3.6 MW wind turbine at the Anholt offshore wind farm off Denmark and fell into the sea. Following the incident, the operator, Orsted, requested precautionary no-sail zones around wind farms in three European countries that use the same turbine model, while it investigated whether the failure indicated a wider fleet issue. After reviewing fleet performance data and carrying out drone inspections of the affected turbine, Orsted concluded the failure was an isolated event rather than a systemic problem, and subsequently lifted the maritime traffic restrictions at its affected sites.
Contributing factors
The source does not report a specific technical cause for the separation of the rotor and blades; Orsted's investigation only concluded that the event was not indicative of a systemic issue across its fleet of Siemens Gamesa 3.6 MW to 4 MW turbines.
Lessons learned
- Rotor detachment on a Siemens Gamesa offshore turbine requires early fleet data review and drone inspections to decide if no-sail zones can be lifted.
- Precautionary no-sail zones around the same turbine model in multiple countries must be based on confirmed risk, not assumed fleet-wide failure.
More lessons on structural integrity and turbines, investigation and fleet-wide checks, from every incident on the register.
Not yet known
- Specific technical cause of rotor separation
- Turbine age and maintenance history
- Duration of no-sail zones and lost generation
This entry is updated when these are reported. Get an alert for the next one like it.
Site page: Anholt (status, dates and other incidents)
Published 2026-09-15. Written from public reporting. Descriptive, not investigative. See the data accuracy disclaimer.