Vessel collision at Port of Esbjerg damages nine wind turbine blades
June 2026Published 7 Sept 2026Responsible editor: Chief Editor
- Where
- Port of Esbjerg, Denmark
- What
- Vessel collision damages nine wind turbine blades
- Injuries
- One person taken to hospital for check-up
- Cause
- High winds and poor weather conditions
- Outcome
- Nine blades damaged, each worth about €3.6m
Get the next one by email
Free alerts on wind (offshore) incidents in Denmark, and an email when EIR-0256 is updated. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Companies named in the reporting of this entry (being named is not a finding of fault): Fred. Olsen Windcarrier
What happened
On 10 June 2026, the wind turbine installation vessel (WTIV) Brave Tern, owned by Fred. Olsen Windcarrier, struck Cadeler's vessel Wind Keeper, a shore crane and a pier while manoeuvring in high winds at the Port of Esbjerg, Denmark. The vessel had just completed load-out of nine turbine blades destined for RWE's 1.1GW Thor offshore wind farm, and the collision damaged all nine blades. Local media reported that one person was taken to hospital for a check-up.
The Danish Maritime Authority detained the Brave Tern following the incident and inspected both vessels and the port infrastructure for further damage. Each blade is estimated to be worth approximately €3.6m. It remains unclear whether the incident will delay installation work on the Thor wind farm, which began in March 2026 and is scheduled for completion this year.
Contributing factors
High winds and poor weather conditions during harbour manoeuvring were cited as contributing to the collision.
Lessons learned
- High winds during port manoeuvring of a loaded WTIV can cause collisions with other vessels, cranes and piers, so operators must enforce wind limits specific to vessel size and load.
- Damage to high-value turbine blades in port can create supply and schedule risks for an offshore wind farm even before installation starts.
More lessons on structural integrity and turbines, from every incident on the register.
Not yet known
- Exact cause of the collision
- Whether the incident will delay Thor wind farm installation
- Model and age of the two vessels
This entry is updated when these are reported. Get an alert for the next one like it.