Offshore wind · Denmark
Thor Offshore wind farm
Operator Thorsminde Port · Owner Norges Bank Investment Management; RWE AG [51%]
Planned (permitted)1,000 MWData checked 8 October 2026Source record dated 24 April 2025
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Thor Offshore wind farm is a 1,000 MW offshore wind farm 27 km south-west of Lemvig, Denmark. It first operated in 2027. Its status in the Global Energy Monitor solar and wind trackers is planned (permitted). No other energy site in the register's datasets is within 10 km. The register holds one incident at this site, the latest in 2026.
Incidents on the register at this site
On 10 June 2026, the wind turbine installation vessel (WTIV) Brave Tern, owned by Fred. Olsen Windcarrier, struck Cadeler's vessel Wind Keeper, a shore crane and a pier while manoeuvring in high winds at the Port of Esbjerg, Denmark. The vessel had just...
Matched by the site's name in the entry's own reporting. If one is wrong, tell the editor.
Get an email when Thor Offshore wind farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, offshore wind incidents in Denmark. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preview of the planning evidence pack for this site
No comparable incidents are recorded near this site yet.
The register holds no offshore wind incident to set against this site today. A pack would still set out the incidents within 50 km of any kind, sites of a similar size worldwide and the guidance consultees cite.
Order the pack for this site. £295, by email in minutes.
The site
- Technology
- Offshore wind
- Capacity
- 1,000 MW
- Capacity figure from
- Global Energy Monitor solar and wind trackers
- Status
- Planned (permitted) (Pre-construction)
- Operator
- Thorsminde Port
- Owner
- Norges Bank Investment Management; RWE AG [51%]
- Location
- Thorsminde, Denmark
- First operating
- 2027
View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.
Questions
- Has Thor Offshore wind farm had a fire or other incident?
- Yes. The register holds one incident that names it: Vessel collision at Port of Esbjerg damages nine wind turbine blades (EIR-0256, 2026).
- What is the status of Thor Offshore wind farm?
- Planned (permitted), in the Global Energy Monitor solar and wind trackers, where it last changed on 24 April 2025.
- Where is Thor Offshore wind farm?
- 27 km south-west of Lemvig, Denmark.
Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).