Solar · Denmark

Nees Hede hybrid solar wind project solar farm

Owner Cloudberry Clean Energy ASA [20%]

Planned (permitted)140 MWData checked 12 November 2026Source record dated 22 April 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Nees Hede hybrid solar wind project solar farm is a 140 MW solar farm 19 km south of Lemvig, Jutland, Midtjylland, Denmark. Its status in the Global Energy Monitor solar and wind trackers is planned (permitted). There are 21 other energy sites within 10 km, 2 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 0 incidents at solar farms (hybrid battery and solar sites included) in Denmark, and 480 worldwide.

No comparable incidents are recorded near this site yet.

The register holds no solar incident to set against this site today. A pack would still set out the incidents within 50 km of any kind, sites of a similar size worldwide and the guidance consultees cite.

Order the pack for this site. £295, by email in minutes.

Technology
Solar
Capacity
140 MW
Capacity figure from
Global Energy Monitor solar and wind trackers
Status
Planned (permitted) (Pre-construction)
Owner
Cloudberry Clean Energy ASA [20%]
Location
Lemvig, Jutland, Midtjylland, Denmark

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Nees Hede hybrid solar wind project solar farm. If you know of one, report it (confidential reports are anonymised).

Has Nees Hede hybrid solar wind project solar farm had a fire or other incident?
None is on the register as of 22 November 2026. The register holds no published incident that names Nees Hede hybrid solar wind project solar farm; it holds 0 incidents at solar farms (hybrid battery and solar sites included) in Denmark.
What is the status of Nees Hede hybrid solar wind project solar farm?
Planned (permitted), in the Global Energy Monitor solar and wind trackers, where it last changed on 22 April 2025.
Where is Nees Hede hybrid solar wind project solar farm?
19 km south of Lemvig, Jutland, Midtjylland, Denmark.

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).