Wind damage and small fire at Shaftsbury solar array, Vermont
Oct 2025Published 20 Nov 2026Responsible editor: Chief Editor
Get the next one by email
Free alerts on solar PV incidents in the United States, and an email when EIR-2974 is updated. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Companies named in the reporting of this entry (being named is not a finding of fault): Green Mountain Power
What happened
A 2.2 MW solar installation on Waite Cemetery Road in Shaftsbury, Vermont, has suffered wind damage and a small fire, according to a Bennington Banner report based on filings with the Public Utility Commission. The site is held under a certificate of public good by ER Waite Cemetery Solar, LLC. In filings, the company's attorney acknowledged that a windstorm on 30 October 2025 damaged solar panel modules. The attorney said the certificate holder placed the site in a safe condition and disconnected it from the grid in cooperation with Green Mountain Power.
The report says a further wind-damage incident occurred in March; the source does not state the year, which is inferred as 2026. The report states that a small fire broke out at the site on 12 April 2026 and that the Shaftsbury Fire Department extinguished it before it spread. The report says that at the request of the owner's insurance company, no work was carried out after the October incident until an inspection was completed in January 2026.
Damaged panels were seen on the ground in April and were later removed. Residents and state agencies have raised concerns about possible environmental contamination from broken panels. These concerns are not established in the source.
Contributing factors
The source reports repeated wind events at a hilltop site that damaged panel modules. The insurer-requested inspection and a seasonal restriction on work near a deer wintering area delayed repair and removal of damaged panels. The source does not state the cause of the fire.
Lessons learned
- Ground-mounted arrays in windy locations should be designed and inspected for local wind loading, and checked after each high-wind event.
- Operators should agree a damage-response plan so that safe isolation and removal of broken modules is not delayed by lengthy insurer inspections or seasonal work restrictions.
- Broken and fire-damaged modules should be treated as potentially hazardous material, with environmental assessment that goes beyond visual inspection.
More lessons on maintenance, inspection and ageing assets, electrical protection and isolation, from every incident on the register.
Source
Site page: Shaftsbury Solar (status, dates and other incidents)
Published 2026-11-20. Written from public reporting. Descriptive, not investigative. See the data accuracy disclaimer.