Underground transformer fire blows manhole covers off in downtown Albany
Feb 2019Published 14 Sept 2026Responsible editor: Chief Editor
- Where
- Underground near Henry Johnson Boulevard and State Street, Albany, New York
- Operator
- National Grid
- What
- Underground transformer fire with two explosions
- Cause
- Electrical arcing in underground equipment
- Outcome
- Windows shattered, cars damaged, two-hour evacuations and outages
Get the next one by email
Free alerts on grid infrastructure incidents in the United States, and an email when EIR-0704 is updated. No account needed; unsubscribe in one click.
Confirm your email and every substation and transformer incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Companies named in the reporting of this entry (being named is not a finding of fault): National Grid
What happened
An underground electrical transformer fire caused by electrical arcing led to two explosions in downtown Albany, New York, blowing manhole covers off near the intersection of Henry Johnson Boulevard and State Street. The blast concussion shattered windows in nearby buildings and damaged two parked cars. Residents of several buildings, including a 66-unit residential building, were evacuated for approximately two hours due to carbon monoxide and smoke concerns, and had to leave again after the building lost power.
National Grid, the utility operator, worked with city fire, police and water departments to manage road closures, canvass evacuated buildings, and inspect underground water infrastructure for damage. Repairs were expected to take up to 24 hours, with some customers facing extended outages while an electrical contractor installed temporary generators at affected homes.
Contributing factors
National Grid attributed the fire to electrical arcing in underground equipment.
Lessons learned
- Underground transformer arcing can cause explosions that eject manhole covers and damage nearby buildings and cars.
- Utilities must coordinate with fire, police and water departments when underground faults may affect other buried services.
- Operators need plans for temporary generators when underground repairs will last up to 24 hours.
Not yet known
- Transformer model and age
- Exact location of the arcing fault
- Cost of repairs and damage
This entry is updated when these are reported. Get an alert for the next one like it.
Source
Other entries that name Albany
Published 2026-09-14. Written from public reporting. Descriptive, not investigative. See the data accuracy disclaimer.