Onshore wind · United Kingdom

Beinn Thulabaigh Wind Turbine

Operator Knock and Swordale Community Company

Awaiting Construction5 MWData checked 16 November 2026Source record dated 23 September 2020

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Beinn Thulabaigh Wind Turbine is a 5 MW wind farm 5.5 km west of Stornoway, Western Isles, United Kingdom. Its planning application (19/00209/PPW) went to Na h-Eileanan Siar on 8 May 2019 and was granted on 21 May 2020. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 7 other energy sites within 10 km, 6 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Beinn Thulabaigh Wind Turbine sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0767, Nordex turbine fire prompts investigation at Scottish wind farm, 212 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-07672024Nordex turbine fire prompts investigation at Scottish wind farm212 kmSignificant
EIR-00632024Fatal fall from turbine nacelle during onshore wind maintenance, UK212 kmMajor
EIR-00322017Fatal fall during onshore wind turbine construction, inquiry findings on rescue arrangements and equipment212 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Capacity
5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Knock and Swordale Community Company
Location
Sandwick North Street (Beinn B, Pentland Road To Achmore, Achmore, Isle Of Lewis, Western Isles), Western Isles, HS2, United Kingdom
Planning authority
Na h-Eileanan Siar
Planning application
19/00209/PPW
Turbines
1, 145 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 19/00209/PPW, with what the planning evidence pack adds for this site.

Every application in Na h-Eileanan Siar · Alerts for applications and incidents near here

  • 8 May 2019 Planning application submitted
  • 21 May 2020 Planning permission granted
  • 21 May 2025 Planning permission expired

None found. The register holds no published incident that names Beinn Thulabaigh Wind Turbine. If you know of one, report it (confidential reports are anonymised).

Has Beinn Thulabaigh Wind Turbine had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Beinn Thulabaigh Wind Turbine; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Beinn Thulabaigh Wind Turbine?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 23 September 2020.
Where is Beinn Thulabaigh Wind Turbine?
5.5 km west of Stornoway, Western Isles, United Kingdom (postcode HS2).