Onshore wind · United Kingdom
Loch Sminig Wind Project
Operator Urras Oighreachd Ghabhsainn
Operational2.7 MWData checked 16 November 2026Source record dated 16 June 2016
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Loch Sminig Wind Project is a 2.7 MW wind farm 19 km north of Isle of Lewis, Western Isles, United Kingdom. Its planning application (08/00407/PPD) went to Na h-Eileanan Siar on 29 August 2008 and was granted on 6 May 2009. It has been operating since 15 September 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. No other energy site in the register's datasets is within 10 km. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Loch Sminig Wind Project changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 2.7 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Urras Oighreachd Ghabhsainn
- Location
- Either side of the road between Baile an Truiseil and Upper Barvas, Stornoway, Isle of Lewis, HS2 0QX, Western Isles, United Kingdom
- Planning authority
- Na h-Eileanan Siar
- Planning application
- 08/00407/PPD
- First operating
- 2015
- Turbines
- 3
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 08/00407/PPD, with what the planning evidence pack adds for this site.
Every application in Na h-Eileanan Siar · Alerts for applications and incidents near here
Timeline
- 29 August 2008 Planning application submitted
- 6 May 2009 Planning permission granted
- 3 June 2013 Construction started
- 15 September 2015 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Loch Sminig Wind Project. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Loch Sminig Wind Project had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Loch Sminig Wind Project; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Loch Sminig Wind Project?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 16 June 2016.
- Where is Loch Sminig Wind Project?
- 19 km north of Isle of Lewis, Western Isles, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).