Onshore wind · United Kingdom
Druim Leathann Wind Farm
Operator Forsa (formerly 2020 Renewables/Velocita)
Revised42 MWData checked 16 November 2026Source record dated 27 February 2018
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Druim Leathann Wind Farm is a 42 MW wind farm 15 km north-east of Isle of Lewis, Western Isles, United Kingdom. Its planning application (13/00215/PPDM) went to Na h-Eileanan Siar on 30 April 2013 and was granted on 5 December 2013. Its status in the Renewable Energy Planning Database (UK government) is revised. There are 2 other energy sites within 10 km. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Druim Leathann Wind Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Druim Leathann Wind Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0767, Nordex turbine fire prompts investigation at Scottish wind farm, 215 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0767 | 2024 | Nordex turbine fire prompts investigation at Scottish wind farm | 215 km | Significant |
| EIR-0063 | 2024 | Fatal fall from turbine nacelle during onshore wind maintenance, UK | 215 km | Major |
| EIR-0032 | 2017 | Fatal fall during onshore wind turbine construction, inquiry findings on rescue arrangements and equipment | 215 km | Major |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Onshore wind
- Capacity
- 42 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Revised
- Operator or applicant
- Forsa (formerly 2020 Renewables/Velocita)
- Location
- 2km west of Tolsta and 16km north east of Stornoway, Western Isles, United Kingdom
- Planning authority
- Na h-Eileanan Siar
- Planning application
- 13/00215/PPDM
- Turbines
- 14, 126 m to tip
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 13/00215/PPDM, with what the planning evidence pack adds for this site.
Every application in Na h-Eileanan Siar · Alerts for applications and incidents near here
Timeline
- 30 April 2013 Planning application submitted
- 5 December 2013 Planning permission granted
- 31 December 2016 Planning permission expired
Incidents on the register at this site
None found. The register holds no published incident that names Druim Leathann Wind Farm. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Druim Leathann Wind Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Druim Leathann Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Druim Leathann Wind Farm?
- Revised, in the Renewable Energy Planning Database (UK government), where it last changed on 27 February 2018.
- Where is Druim Leathann Wind Farm?
- 15 km north-east of Isle of Lewis, Western Isles, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).