Battery storage · United Kingdom

High Constellation Wind Farm

Operator BayWa r.e. UK Limited · Owner Baywa AG

Awaiting Construction55.5 MWData checked 16 November 2026Source record dated 25 August 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

High Constellation Wind Farm is a 55.5 MW battery storage site 22 km north-west of Isle of Arran, Argyll and Bute, United Kingdom. Its planning application (ECU00001857) went to Scottish Government (S36) on 28 May 2019 and was granted on 26 June 2020. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 13 other energy sites within 10 km, one of them a battery storage site. The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

BAYWA R.E. UK LIMITED (07538870), active, since 2011. 3 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for High Constellation Wind Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 306 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool306 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells403 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire501 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Co-located with RE)
Capacity
55.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
BayWa r.e. UK Limited
Owner
Baywa AG
Location
Mull of Kintyre, Argyll and Bute, United Kingdom
Planning authority
Scottish Government (S36)
Planning application
ECU00001857

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for ECU00001857, with what the planning evidence pack adds for this site.

Every application in Scottish Government (S36) · Alerts for applications and incidents near here

  • 28 May 2019 Planning application submitted
  • 26 June 2020 Planning permission granted
  • 26 June 2026 Planning permission expired

None found. The register holds no published incident that names High Constellation Wind Farm. If you know of one, report it (confidential reports are anonymised).

Has High Constellation Wind Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names High Constellation Wind Farm; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of High Constellation Wind Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 25 August 2026.
Where is High Constellation Wind Farm?
22 km north-west of Isle of Arran, Argyll and Bute, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).