← Back to Strathclyde

Battery storage · United Kingdom

Sheirdrim Renewable Energy Development - Battery

Operator ScottishPower Renewables · Owner Scottishpower Renewable Energy Limited

Appeal Refused38 MWData checked 16 November 2026Source record dated 10 July 2023

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Sheirdrim Renewable Energy Development - Battery is a 38 MW battery storage site 26 km north-west of Isle of Arran, Strathclyde, United Kingdom. Its planning application (ECU00001957) went to Scottish Government (S36) on 10 October 2019 and was refused on appeal on 26 June 2023. Its status in the Renewable Energy Planning Database (UK government) is appeal refused. There are 13 other energy sites within 10 km, 2 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

The operator's 22 other sites and 77 energy sites within 40 km for Sheirdrim Renewable Energy Development - Battery

Members see the sites and incidents around this one, and every record behind them.

SCOTTISHPOWER RENEWABLES (UK) LIMITED (NI028425), active, since 1994. 3 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Battery storage (Co-located with RE)
Capacity
38 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Appeal Refused
Operator or applicant
ScottishPower Renewables
Owner
Scottishpower Renewable Energy Limited
Location
Sheirdrim Windfarm East Of, Clachan, Tarbert, Strathclyde, Strathclyde, PA29 6, United Kingdom
Planning authority
Scottish Government (S36)
Planning application
ECU00001957

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for ECU00001957, with what the planning evidence pack adds for this site.

Every application in Scottish Government (S36) · Alerts for applications and incidents near here

  • 10 October 2019 Planning application submitted
  • 21 March 2021 Appeal lodged
  • 26 June 2023 Appeal refused

None found. The register holds no published incident that names Sheirdrim Renewable Energy Development - Battery. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Sheirdrim Renewable Energy Development - Battery had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Sheirdrim Renewable Energy Development - Battery; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Sheirdrim Renewable Energy Development - Battery?
Appeal Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 10 July 2023.
Where is Sheirdrim Renewable Energy Development - Battery?
26 km north-west of Isle of Arran, Strathclyde, United Kingdom (postcode PA29 6).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).