Battery storage · United Kingdom

Harestanes Windfarm

Operator ScottishPower Renewables · Owner Scottishpower Renewables (Uk) Limited

Operational100 MWData checked 16 November 2026Source record dated 23 July 2024

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Harestanes Windfarm is a 100 MW battery storage site 18 km north of Locharbriggs, Dumfries and Galloway, United Kingdom. Its planning application (ECU00001870) went to Scottish Government (S36) on 20 June 2019 and was granted on 20 December 2019. Construction started on 1 July 2022. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 14 other energy sites within 10 km, 5 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

The operator's 22 other sites and 198 energy sites within 40 km for Harestanes Windfarm

Members see the sites and incidents around this one, and every record behind them.

21 Oct10 Nov
Dynamic Containment

Full revenue and market view The pounds behind each bar, any period back to 2021, where it ranks against every site like it, who trades it, and a side-by-side with any other site.

A day out costs this site about £5,569 at its earnings over the last 21 settled days (response and reserve auctions). A figure from the market, not a claim: what the site earned, averaged, is what a day out forgoes.

Contains BMRS data © Elexon Limited copyright and database right (datasets B1610 and MID, the interim settlement run). Read each morning; a settled figure can be revised in later runs.

SCOTTISHPOWER RENEWABLES (UK) LIMITED (NI028425), active, since 1994. 3 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Battery storage (Co-located with RE)
Capacity
100 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational (Under Construction)
Operator or applicant
ScottishPower Renewables
Owner
Scottishpower Renewables (Uk) Limited
Location
Harestanes Windfarm, Forest Of Ae, Northwest Of Ae Village, Moffat, Dumfries and Galloway, Dumfries and Galloway, DG10, United Kingdom
Planning authority
Scottish Government (S36)
Planning application
ECU00001870

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for ECU00001870, with what the planning evidence pack adds for this site.

Every application in Scottish Government (S36) · Alerts for applications and incidents near here

  • 20 June 2019 Planning application submitted
  • 20 December 2019 Planning permission granted
  • 1 July 2022 Construction started

None found. The register holds no published incident that names Harestanes Windfarm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Harestanes Windfarm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Harestanes Windfarm; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Harestanes Windfarm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 23 July 2024.
Where is Harestanes Windfarm?
18 km north of Locharbriggs, Dumfries and Galloway, United Kingdom (postcode DG10).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).